background image

TABLE OF CONTENTS 

 

 

Important Instructions ......................................................................................................................... 2 
 
SECTION I: Introduction ................................................................................................................... 3 
 
SECTION II: Residential /Mobile Home Freestanding Installation and Clearances ......................... 4 
Floor Protection .................................................................................................................................. 5 
A.  Vertical Exit Using Single Wall Pipe /Listed 2100° UL 103 HT chimney w/out 

Close Clearance/Pipe Shields ....................................................................................................... 6 

B.  Vertical Wall Exit Using Single Wall Pipe and Elbow /Listed 2100° UL 103 HT Chimney 

and T-BOX assembily w/out Close Clearance/Pipe Shields ........................................................ 8 

C.  Vertical Exit Using DVL Close Clearance Pipe /Listed 2100° UL 103 HT chimney with 

Close Clearance/Pipe Shields ..................................................................................................... 10 

D.  Vertical Wall Exit Using DVL Close Clearance Pipe ,and Elbow /Listed 2100° UL 103 HT 

Chimney and T-BOX assembly with Close Clearance/Pipe Shields .......................................... 12 

Out Side Air Installation ................................................................................................................... 14 
 
SECTION III: Alcove Installation and Clearances .......................................................................... 17 

Floor Protection .......................................................................................................................... 18 
Alcove Installation Clearances .............................................................................................. 19-20 

 
Installation of Close Clearances Shields ........................................................................................... 22 
 
SECTION IV: Operation .................................................................................................................. 23 
 
Ash Removal .................................................................................................................................... 24 
 
SECTION V: Optional Motor Installation ....................................................................................... 25 
 
SECTION VI: Wood Heater Safety ................................................................................................. 28 
 
SECTION VII: Troubleshooting ...................................................................................................... 29 
 
LIMITED WARRANTY .................................................................................................................. 30 

Содержание FS 21

Страница 1: ...INSTRUCTIONS CONTACT THE AUTHORITY HAVING JURISDICTION SUCH AS MUNICIPAL BUILDING DEPARTMENT FIRE DEPARTMENT FIRE PREVENTION BUREAU etc CONSULT BEFORE INSTALLATION TO DETERMINE THE NEED TO OBTAIN A PE...

Страница 2: ......

Страница 3: ...8 C Vertical Exit Using DVL Close Clearance Pipe Listed 2100 UL 103 HT chimney with Close Clearance Pipe Shields 10 D Vertical Wall Exit Using DVL Close Clearance Pipe and Elbow Listed 2100 UL 103 HT...

Страница 4: ...s in your home The Model FS 21 is approved for use in specified Pre Fabricated fireplaces ZCF s Use the list on Page 11 or contact your dealer for additional units Examine the masonry fireplace and ch...

Страница 5: ...to the firebox through the secondary air tubes at the top of the firebox This secondary air burns the impurities in the smoke released from the initial wood burning The temperature necessary for this...

Страница 6: ...motor is being used Do not run power cord under unit or in high traffic areas 3 Check the primary air draft control to ensure that it slides freely 4 Remove any items from within the firebox Chimney...

Страница 7: ...the overall R value of the system is grater than the R value of the specified floor protec tor the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K...

Страница 8: ...Exit using 6 Single wall minimum 24 ga blued or black pipe and any Listed 2100 UL 103 HT Chimney Without optional close clearance shield and pipe shield NOTE For minimum clearances See Page 7 Figure...

Страница 9: ...24 ga blued or black pipe and minimum floor protector The clearances above may be reduced Follow NFPA 211 codes if available or follow instructions on Pages 10 and 11 C C C C Figure 3 SINGLE WALL CON...

Страница 10: ...ition and project a point onto the plumb line level with the center of the elbow 3 Measure up so there will be at least 1 4 rise per foot of horizontal connector pipe maintaining clearances to the cei...

Страница 11: ...th elbow and minimum floor protector Clearances above may be reduced Follow NFPA 211 codes if available or follow instructions on Pages 12 and 13 Figure 4 A B C D E F G MODEL 21 25 13 13 15 5 8 6 16 S...

Страница 12: ...exit A small weight on a string will serve as a plumb bob Mark the ceiling where the string is suspended to locate the center of the chimney 2 After locating the center of the hole install the ceilin...

Страница 13: ...ALL BUCK STOVE LISTED 2100 UL 103 HT TYP CHIMNEY RADIATION SHIELD LISTED 2100 UL 103 HT TYP CHIMNEY DVL CLOSE CLEARANCE PIPE NOTE See Page 22 for installation of optional close clearance shields and p...

Страница 14: ...ce Pipe maintain manufacturer s minimum clearances between pipe and ceiling 2 Place the vertical portion of the heater pipe and the elbow in position and project a point onto the plumb line level with...

Страница 15: ...or Figure 8 A B C D E F G MODEL 21 19 7 7 8 5 8 6 16 DVL CLOSE CLEARANCE PIPE IN SIDE WALL CEILING Maintain 18 Minimum Clearance WALL PASS THROUGH CONNECTOR CENTER LINE OF ELBOW MARK PLUMB LINE ON WAL...

Страница 16: ...ate two holes in bottom of base for securing the pedestal to pad and floor and mark holes location on pad See Figure 10A Place heater out of the way of the installation area 8 Now use a 3 8 masonry bi...

Страница 17: ...HEN MOBILE HOME IS NOT UNDERPINNED Figure 10C 4 10x1 OUTSIDE AIR DUCT THROUGH UNDERPINNED 24 min 610 mm OUTSIDE AIR DUCT THROUGH FLOOR WHEN MOBLE HOME IS NOT UNDERPENNED RAIN CAP FLASHING RADIATION SH...

Страница 18: ...rom the front of the stove Smoking usually indicates a defective or poorly positioned chimney Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open da...

Страница 19: ...s being used Do not run power cord under unit or in high traffic areas 3 Check the primary air draft control to ensure that it slides freely 4 Remove any items from within the firebox Chimney This mod...

Страница 20: ...the overall R value of the system is grater than the R value of the specified floor protec tor the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K...

Страница 21: ...serve as a plumb bob Mark the ceiling where the string is suspended to locate the center of the chimney 2 After locating the center of the hole install the ceiling support box chimney or chimney conne...

Страница 22: ...and minimum floor protector A B C D E F G H MODEL 21 19 7 84 8 5 8 6 16 48 BUCK STOVE C Figure 12 CEILING SUPPORT CEILING INSTALLATION FLASHING CONTEMPORARY CAP STORM COLLAR DO NOT OBSTRUCT CAULK NEW...

Страница 23: ...rom the front of the stove Smoking usually indicates a defective or poorly positioned chimney Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open da...

Страница 24: ...TURE BELOW 3 Drill two 2 3 16 holes in the sides of the stove where the shield meets the front side Insert two 2 3 8 self tapping screws SEE PICTURE BELOW 4 Next loosen two 2 top screws holding side s...

Страница 25: ...ral pieces of dry kindling on top of the newspaper 6 Place three or four small pieces of firewood 2 3 in diameter on top of the kindling 7 Light the newspaper in the front Close and latch the door Don...

Страница 26: ...ERSED THEY DISPOSED OF BY BURIAL IN SOIL OR FINAL DISPOSAL IF THE ASHES ARE ALL COMBUSTIBLE MATERIALS PENDING OR ON THE GROUND WELL AWAY FROM CLOSED CONTAINER OF ASHES SHOULD WITH A TIGHT FITTING LID...

Страница 27: ...OSITION IS AT THE 8 O CLOCK POSITION AND LOW IS AT THE 4 O CLOCK POSITION MOUNT RHEOSTAT BY PLACING IT BEHIND HEARTH SUPPORT WITH WIRES ON BOTTOM SIDE PLACE PLASTIC STUD THROUGH HOLE IN BRACKET AND SE...

Страница 28: ...Page 26 STEP 1 STEP 2 STEP 3 WIRE DIAGRAM...

Страница 29: ...BLACK FLAT GASKET WITH ADHESIVE 1 JUMPER WIRE 4 MALE FEMALE TERMINAL 1 110 THERMOSTAT 1 RHEOSTAT 1 RHEOSTAT NUT 1 RHEOSTAT INDICATOR KNOB 1 RHEOSTAT LABEL 1 POWER CORD 1 STRAIN RELIEF 1 6 WIRE TIE 1...

Страница 30: ...lower running DISPOSAL OF ASHES Ashes should be placed in a metal container with a tight fitting lid The closed container of ashes should be placed on a noncombustible floor or on the ground well away...

Страница 31: ...draft or inlet air a Close inlet air control as much as possible to maintain desired heat output b Check gaskets reinstall fiberglass gasket around doors and glass as necessary Improper door fitting...

Страница 32: ...ransportation charges required Thereafter B Period II For the period after the first year from the date of purchase and extending for five years as long as the Buck Stove is owned by the original purc...

Страница 33: ...this warranty must be performed by an authorized Buck Stove service representative Repairs or attempted repairs by anyone other than an authorized service representative are not covered under this wa...

Отзывы: