![NetApp H410S Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/netapp/h410s/h410s_hardware-information_1669954009.webp)
Use caution while lifting the hardware and installing it into the rack. An H610S chassis
weighs 40.5 lb (18.4 kg).
2. Cable the nodes.
If the airflow vents at the rear of the chassis are blocked by cables or labels, it can lead to
premature component failures due to overheating.
◦
Connect the node to a 10/25GbE network using two SFP28 or SFP+ cables.
◦
Connect the node to a 1GbE network using two RJ45 connectors.
◦
Connect the node to a 1GbE network using an RJ-45 connector in the IPMI port.
◦
Connect both power cables to the node.
3. Power on the nodes.
It takes approximately five minutes and 30 seconds for the node to boot.
7