NetApp H410S Скачать руководство пользователя страница 16

2. Verify that the serial number on the service tag matches the NetApp Support case number when you

ordered the replacement chassis.

3. Plug in the keyboard and monitor to the back of the failed chassis.

4. Verify the serial number of the failed node with NetApp Support.

5. Power down the chassis.

6. Label the drives in the front and cables at the back with their locations, so that you can put them back in

the same locations after the replacement. See the following image for the placement of the drives in the
chassis:

7. Remove the cables.

8. Remove the chassis by unscrewing the thumbscrews on the mounting ears. You should package and

return the failed chassis to NetApp.

9. Install the replacement chassis.

10. Remove the drives carefully from the failed chassis, and insert them in the replacement chassis.

You should insert the drives in the same slots they were in before you removed them.

11. Remove the power supply units from the failed chassis, and insert them in the replacement chassis.

12. Insert the power supply cables, and the network cables in their original ports.

13. Small form-factor pluggable (SFP) transceivers might be inserted in the 10GbE ports of the replacement

node. You should remove them before you cable the 10GbE ports.

See your switch vendor’s documentation if your switch does not recognize the cables.

14

Содержание H410S

Страница 1: ...information Element Software NetApp March 11 2022 This PDF was generated from https docs netapp com us en element software hardware task_h410s_h610s_install html on March 11 2022 Always check docs ne...

Страница 2: ...of Contents H410S and H610S hardware information 1 Find more information 1 Install H series storage nodes 1 Replace a H410S node 8 Replace a H610S node 12 Replace drives 15 Replace a power supply uni...

Страница 3: ...for earlier versions of NetApp SolidFire and Element products Install H series storage nodes Before you get started with your all flash storage system you should install and set up the storage nodes...

Страница 4: ...H610S The terms node and chassis are used interchangeably in the case of H610S because node and chassis are not separate components unlike in the case of a 2U four node chassis 2...

Страница 5: ...Prepare for installation In preparation for installation inventory the hardware that was shipped to you and contact NetApp Support if any of the items are missing 3...

Страница 6: ...slightly for each node model Install hardware from the bottom of the rack up to the top to prevent the equipment from toppling over If your rack includes stabilizing devices install them before you i...

Страница 7: ...other side of the rack H610S Here is an illustration for installing rails for an H610S storage node There are left and right rails on the H610S Position the screw hole towards the bottom so that the H...

Страница 8: ...lead to premature component failures due to overheating Connect two CAT5e or higher cables in ports A and B for management connectivity Connect two SFP28 SFP cables or transceivers in ports C and D f...

Страница 9: ...ls it can lead to premature component failures due to overheating Connect the node to a 10 25GbE network using two SFP28 or SFP cables Connect the node to a 1GbE network using two RJ45 connectors Conn...

Страница 10: ...of band management port See this KB article log in required Create a cluster After you add the storage node to your installation and configure the new storage resource you are ready to create a new s...

Страница 11: ...h level overview of the steps Prepare to replace the node Replace the node in the chassis Add the node to the cluster Prepare to replace the node You should remove the faulty storage node correctly fr...

Страница 12: ...e faulty node from the cluster using the NetApp Element software UI you are ready to physically remove the node from the chassis You should install the replacement node in the same slot in the chassis...

Страница 13: ...do not use excessive force when sliding the node into the chassis 8 Move the drives from the node you removed and insert them in the new node 9 Reconnect the cables to the ports from which you origin...

Страница 14: ...w the list of available drives 7 Do one of the following To add individual drives select the Actions icon for the drive you want to add and then select Add To add multiple drives select the check boxe...

Страница 15: ...de What you ll need You have contacted NetApp Support If you are ordering a replacement you should have a case open with NetApp Support You have obtained the replacement node You have an electrostatic...

Страница 16: ...unscrewing the thumbscrews on the mounting ears You should package and return the failed chassis to NetApp 9 Install the replacement chassis 10 Remove the drives carefully from the failed chassis and...

Страница 17: ...D bag by hand or cut the top off with a pair of scissors Always wear an ESD wrist strap grounded to an unpainted surface on your chassis Always use both hands when removing installing or carrying a dr...

Страница 18: ...drive to NetApp Here is the front view of the H610S and H410S storage nodes with the drives b H410S only Perform the following steps i Identify the node by matching the serial number service tag with...

Страница 19: ...ps i Match the slot number of the failed drive from the Element UI with the number on the chassis The LED on the failed drive is lit amber ii Remove the bezel iii Press the release button and remove t...

Страница 20: ...it as soon as possible to ensure that the chassis has a redundant power source What you ll need You have determined that the power supply unit is faulty You have a replacement power supply unit You ha...

Страница 21: ...umber S N and drive layout Confirm the node s serial number to be serviced If you are replacing both power supply units continue to step 3 If you are replacing only one power supply unit skip to step...

Страница 22: ...your RMA does not match the wattage of the removed power supply Contact NetApp Support for next steps 7 Using both hands align the edges of the power supply unit with the opening in the chassis gentl...

Страница 23: ...Find more information NetApp SolidFire Resources Page Documentation for earlier versions of NetApp SolidFire and Element products 21...

Страница 24: ...WHETHER IN CONTRACT STRICT LIABILITY OR TORT INCLUDING NEGLIGENCE OR OTHERWISE ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE NetApp reserves the...

Отзывы: