![NetApp AltaVault AVA400 Скачать руководство пользователя страница 176](http://html.mh-extra.com/html/netapp/altavault-ava400/altavault-ava400_administration-manual_1669933176.webp)
176
NetApp AltaVault Cloud Integrated Storage Administration Guide
Beta Draft
Migrating data between appliances
Performing appliance data migration
<source appliance (config)> # datamigration send reset
Note:
Data pinned on the source appliance will continue to be pinned on the target appliance.
Post-data migration procedure
Once data migration is complete you will need to complete the setup of the target appliance for production use.
To set up the target appliance for production
1.
Disconnect the target appliance if it is connected directly to the source appliance, and connect it to the network
infrastructure.
2.
If required, reconfigure the data interfaces on the target appliance for the new network.
3.
Issue the following CLI commands on the target appliance to complete data migration and return the appliance to
production use:
<target appliance (config)> # megastore guid reset
<target appliance (config)> # service restart
4.
When migrating from a SteelStore appliance, after the migration to AltaVault 4.1.1 is complete, you can upgrade
to later versions of AltaVault software. For AltaVault software upgrade instructions, see
Содержание AltaVault AVA400
Страница 2: ...Beta Draft ...
Страница 10: ...Beta Draft Contents ...
Страница 182: ...182 NetApp AltaVault Cloud Integrated Storage Administration Guide Disaster recovery Disaster recovery ...
Страница 246: ...246 NetApp AltaVault Cloud Integrated Storage Administration Guide AltaVault appliance MIB SNMP traps ...
Страница 266: ...266 NetApp AltaVault Cloud Integrated Storage Administration Guide Beta Draft Copyright Information ...
Страница 268: ...268 NetApp AltaVault Cloud Integrated Storage Administration Guide Beta Draft Trademark Information ...
Страница 270: ...270 NetApp AltaVault Cloud Integrated Storage Administration Guide Beta Draft How to Send Your Comments ...