Basement and Pit Installation and Maintenance Guide
10
5 Installing the Basement Version
This section describes storage and unpacking instructions, preliminary tests, tools,
materials, site selection, and basement installation of theE-Coder)R900
i
version
MIU.
Prior to Installation
Storage
Upon receipt, inspect shipping containers for damage and inspect the contents of
any damaged cartons prior to storage.
Once the inspection is complete, store the cartons in a clean, dry environment.
Keep in mind that the E-Coder)R900
i
MIU basement version has an internal bat-
tery. Storage for more than one year may affect product life. Be sure to use a first-
in first-out inventory control system. See “Environmental Conditions” on page 3.
The unit should not be transmitting until the box is opened and the unit is exposed
to a light source.
Unpacking
As with all precision electronic instruments, the E-Coder)R900
i
MIU should be
handled carefully; however, no additional special handling is required.
After unpacking the MIU, inspect it for damage. If the MIU appears to be damaged
or proves to be defective upon installation, notify your Neptune Sales Representa-
tive. If one or more items requires reshipment, use the original cardboard box and
packing material.
Figure 5 E-Coder)R900
i
Basement Installation
Содержание E-Coder)R900i
Страница 3: ......
Страница 4: ...E Coder R900i Installation and Maintenance Guide ...
Страница 7: ......
Страница 11: ...viii E Coder R900i Basement and Pit Installation and Maintenance Guide Notes Figures ...
Страница 13: ...x E Coder R900i Basement and Pit Installation and Maintenance Guide Notes Tables ...
Страница 43: ...Notes 4 E Coder R900i Basement and Pit Installation and Maintenance Guide ...
Страница 44: ......