Basement and Pit Installation and Maintenance Guide
5
3 General Installation Guidelines
This section describes tools, materials, and general installation information for the
E-Coder)R900
i
.
Tools and Materials
Tables 1 and 2 show the recommended tools and materials you may need to suc-
cessfully install the E-Coder)R900
i
or to replace the MIU’s internal battery.
Safety and Preliminary Checks
Observe the following safety and preliminary checks before and during each instal-
lation:
• Verify that you are at the location specified on the Site Work Order.
• Verify that the site is safe for you and your equipment.
• Notify the customer of your presence and tell the customer that you will need
access to the water meter.
• If the Site Work Order does not have an MIU ID number on it, write in the ID
number(s) of the MIU you are about to install. If the Site Work Order already
has an MIU ID number on it, verify that it matches the ID numbers on the MIU
you are about to install.
Some items may not apply to your specific installation or the list may not contain all required tools
or materials.
Table 1 Recommended Tools
Item
Description/ Recommendation
Use
Tool Kit
Contains standard tools including:
•
Screwdrivers
•
Hammer
•
Pliers
Various installation procedures
performed by the utility
Flashlight
Activating the MIU
Содержание E-Coder)R900i
Страница 3: ......
Страница 4: ...E Coder R900i Installation and Maintenance Guide ...
Страница 7: ......
Страница 11: ...viii E Coder R900i Basement and Pit Installation and Maintenance Guide Notes Figures ...
Страница 13: ...x E Coder R900i Basement and Pit Installation and Maintenance Guide Notes Tables ...
Страница 43: ...Notes 4 E Coder R900i Basement and Pit Installation and Maintenance Guide ...
Страница 44: ......