Step Four
Transfer the configuration file to a USB drive.
1. Select the Gateway that was created.
2. Click
Build USB
and the following dialog appears.
Figure 27 – Save USB Build
3. Click
OK
.
The R900_Configcfg file is transferred to a USB flash drive..
Step Five
Activate the Gateway in the field.
1. Install the Gateway and power source (UPS or Solar). See
"Installation of the Gateway" on page 29 and "Solar Power
Information" on page 77 in Appendix A.
2. Open the Gateway.
If cellular modem activation is required, see "Cellular and
Ethernet Considerations" on page 107.
3. Insert the USB flash drive into the USB port on the Gateway
until the light turns green.
4. Remove the USB flash drive.
The Gateway reboots and is configured.
5. Press the
Test Report
button on the top right to send data to
the server.
20
R900 Gateway Installation and Maintenance Guide
Chapter 2: Activating Gateway in the Host Software
Содержание 13458-000
Страница 2: ......
Страница 3: ...R900 Gateway v4 Installation and Maintenance Guide...
Страница 6: ...This page intentionally left blank...
Страница 26: ...This page intentionally left blank Chapter 1 Overview 8 R900 Gateway Installation and Maintenance Guide...
Страница 116: ...This page intentionally left blank Appendix A Solar Power Information 98 R900 Gateway Installation and Maintenance Guide...
Страница 149: ......