Nemalux RH-20 Series Скачать руководство пользователя страница 3

Typical wiring diagram

LED DRIVER #1

Ex 'd' Enclosure

Ex 'e' Junction Box

LED+

LED-

N

L

DA

DA

LED1+  LED1-

L

E

N

DA

DA

LED2+

LED2-

Ex 'em' Enclosure

Ex d

Assembly

LED DRIVER #2

LED+

LED-

N
L

DA

DA

LED2+  LED2-

LED1+

LED1-

EQUI

EQUI

1

2
3
4
5

6
7

8

9

1

2
3
4
5

6
7

8

9

L

E

N

DA

DA

LED2+

LED2-

LED1-

LED1+

3.

Open terminal block enclosure

4.

Installer should earth the unit separately – an internal and external earth point are 

provided as standard

5.

Connect wires to mains supply.

6.

If the unit is opened for any reason, disconnect mains

7.

All  RH  floodlights/highbay  have  terminal  blocks  suitable  for  looping  4mm2 cable, 

only one  cable should be connected to each terminal block connection – when incoming 

cables are installed a creepage and clearance of 5mm and 4mm respectively.

8.

To use DALI/Dimming interface, connect the DALI terminals on the terminal block

9.

Ensure no cables are trapped and gasket is seated correctly and replace terminal 

block cover. Tighten to 4Nm

10. If carrying out Insulation Resistance tests the normal method of insulation testing is 

to connect Live and Neutral together and test between this point and Earth to 

prevent the risk of damage to the electronic control gear.

Wire the Mains cable into the terminal block. Provision has 

been  made  for  this  and  identified  as  the  E  (Earth),  L1 

(Switched  Live),  L2  (permanent  live)  and  N  (Neutral) 

terminals. There are two pairs of contacts for each of these 

to facilitate a mains cable that can be looped in and out of 

the  unit.  The  L2  terminals  on  a  standard  unit  are  not 

electrically  connected  but  allows  them  to  be  used  on  the 

same circuits as 

emergency bulkheads.

Mounting 

RH-20/25

 Unit – Highbay Application

 422 (16.6") 

 353 (13.9") 

 536 (21.1") 

 457 (18") 

13

(0.51")

 33 (1.3") 

 172 (6.8") 

E:  Earth 
N: Neutral 
L1: Live

4

-

1

2

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

SUBJECT TO CHANGE WITHOUT NOTICE

MADE IN 

UK

5

-

1

2

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

SUBJECT TO CHANGE WITHOUT NOTICE

MADE IN 

UK

Содержание RH-20 Series

Страница 1: ...ical Specification Trouble Shooting Important information The RH 20 25 series of explosion protected floodlights highbay are specialist devices certified for use in specific operating environments The...

Страница 2: ...ot exceed a temperature rise of 20 C above the ambient conditions select suitable cable 8 To ensure the safety of the equipment ensure that the flamepath on Zone 1 variants are free from any corrosion...

Страница 3: ...ed correctly and replace terminal block cover Tighten to 4Nm 10 If carrying out Insulation Resistance tests the normal method of insulation testing is to connect Live and Neutral together and test bet...

Страница 4: ...ove the power supply from the mains terminals then remove LED red and black wires If replacing a power supply on a Zone 2 luminaire the orange silicone gasket should be replaced at the same time to ma...

Страница 5: ...ned on at the source 4 If LED panel fails to light is it possible to identify if problem is with LED panel or power supply by swapping LED cables to opposite power supply to help identify problem Max...

Страница 6: ...GE WITHOUT NOTICE MADE IN UK Raytec Ltd Unit 15 Wansbeck Business Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom RH Spartan range of High Power Floodlights CML New Port Road Elle...

Страница 7: ...2589 P 1 403 242 7475 F F 1 403 243 6190 E info nemalux com W www nemalux com Industrial LED Lighting designed to solve harsh and hazardous lighting challenges 12 12 www nemalux com sales nemalux com...

Отзывы: