Nemalux RH-20 Series Скачать руководство пользователя страница 2

1. Safety instructions

1. Read this leaflet carefully before commencing to install the RH unit and retain it for 

future use. Installation can only be carried out by suitably qualified personnel.

2. Check  the  certification  to  ensure  that  the  Zone,  mains  supply,  ambient  temperature 

present and ‘T’ rating are suitable for the environment the unit is being installed in.

3. DO NOT open when energised.
4. If the RH unit is to be installed in areas of high vibration, please consult with Nemalux.
5. The RH unit housing is constructed from marine grade aluminium and toughened glass, 

gaskets are silicone sponge, black encapsulant and o rings are silicone rubber, internally 

some  components  are  non-metallic.  The  end  user  must  ensure  that  these materials are 

suitable for the environment the RH unit will be installed in; Zone 1 and Zone 2 Hazardous 

areas.

6. Check certification nameplate on side of floodlight/highbay to ascertain type of threaded 

cable entry on the luminaire. Select suitably certified ATEX/IEC Ex /UKEX cable glands and 

stopper  plugs,  these  must  be  parallel  thread,  have  a  minimum  of  5  full  thread 

engagement and be of a medium/fine tolerance to ISO965-1 and ISO965-3. The cable 

entry devices selected must maintain the IP rating of the luminaire

7. The incoming mains cable should not exceed a temperature rise of 20°C above the 

ambient conditions; select suitable cable. 

8. To ensure the safety of the equipment, ensure that the ‘flamepath’ on Zone 1 variants 

are free from any corrosion. No repairs are possible to flameproof joints – if in doubt 

please consult the manufacturer.

9. External fasteners must have a yield strength of at least 600N/mm2 
10. On Zone 1 variants the LED assembly contains no user serviceable parts, the luminaire 

must not be operated without all the individual LED polycarbonate covers in position, the 

IP66 rating must be maintained.

11. When the unit is installed correctly and in accordance with these installation instructions it 

will not harm humans or animals.

!

Install in a well 

ventilated area

Do not continually 

stare at lamp

Isolate mains before  

removing cover

1.5m

2. Installation

Mounting RH Unit

1.  To meet the requirements of certification a 

MINIMUM

 of 2 fixing points must be used, 

the fixing points must be suitable for the conditions of use. 

2. The line diagrams below are for guidance only – units may be mounted in any orientation

Mounting RH-20/25 Unit – Floodlight Application

 151 

 215 

 350 

 536 

 639 

 173 

 200 

12 

 30 

12 

 151 

 215 

 350 

 536 

 639 

 173 

 200 

12 

 30 

12 

 151 

 215 

 350 

 536 

 639 

 173 

 200 

12 

 30 

12 

2

-

1

2

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

SUBJECT TO CHANGE WITHOUT NOTICE

MADE IN 

UK

3

-

1

2

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

SUBJECT TO CHANGE WITHOUT NOTICE

MADE IN 

UK

Содержание RH-20 Series

Страница 1: ...ical Specification Trouble Shooting Important information The RH 20 25 series of explosion protected floodlights highbay are specialist devices certified for use in specific operating environments The...

Страница 2: ...ot exceed a temperature rise of 20 C above the ambient conditions select suitable cable 8 To ensure the safety of the equipment ensure that the flamepath on Zone 1 variants are free from any corrosion...

Страница 3: ...ed correctly and replace terminal block cover Tighten to 4Nm 10 If carrying out Insulation Resistance tests the normal method of insulation testing is to connect Live and Neutral together and test bet...

Страница 4: ...ove the power supply from the mains terminals then remove LED red and black wires If replacing a power supply on a Zone 2 luminaire the orange silicone gasket should be replaced at the same time to ma...

Страница 5: ...ned on at the source 4 If LED panel fails to light is it possible to identify if problem is with LED panel or power supply by swapping LED cables to opposite power supply to help identify problem Max...

Страница 6: ...GE WITHOUT NOTICE MADE IN UK Raytec Ltd Unit 15 Wansbeck Business Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom RH Spartan range of High Power Floodlights CML New Port Road Elle...

Страница 7: ...2589 P 1 403 242 7475 F F 1 403 243 6190 E info nemalux com W www nemalux com Industrial LED Lighting designed to solve harsh and hazardous lighting challenges 12 12 www nemalux com sales nemalux com...

Отзывы: