background image

1. Safety instructions

1. Read this leaflet carefully before commencing to install the RF unit and retain it for 

future use. Installation can only be carried out by suitably qualified personnel.

2. Check the certification and “T” rating to ensure that the mains supply and the 

ambient temperature present is suitable for the unit being installed.

3. If the RF unit is to be installed in areas of high vibration, please consult with 

Nemalux.

4. Externally the RF unit housing is constructed from marine grade aluminium,  and 

toughened glass, stainless steel brackets/fasteners and silicone gaskets, internally 

there are many non metallic components. The end user must ensure that these 

materials are suitable for the environment the RF unit will be installed in; Zone 1 

and Zone 2 Hazardous areas.

5. Check certification nameplate on side of floodlight to ascertain type of threaded 

cable entry on the luminaire. Select suitably certified ATEX/IEC Ex /UKEX cable glands 

and stopper plugs, these must be parallel thread, have a minium of 5 full thread 

engagement and be of a medium/fine tolerance to ISO965-1 and ISO965-

3.  The cable entry devices selected must maintain the IP rating of the luminaire

6. The incoming mains cable should not exceed a temperature rise of 20°C above the 

ambient conditions; select suitable cable. 

7. When the unit is installed correctly and in accordance with these installation 

instructions it will not harm humans or animals.

8. Before installing emergency luminaires please check the last charge date of the 

battery. This is shown on the external product packaging and also on the battery 

label, alternatively consult date shown on the declaration at the back of this 

leaflet. If the last charge date was in excess of 3 months (if stored at 5

°

C to 25

°

C) or 

1 month (if stored outside this range) from date of installation, please consult 

Nemalux document 0010-D-00001 Battery Handling Guide

!

Install in a well 

ventilated area

Do not continually 

stare at lamp

Isolate mains before  

removing cover

1.5m

2

-

12

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

SUBJECT TO CHANGE WITHOUT NOTICE

MADE IN 

UK

Содержание RF Series

Страница 1: ...ist devices certified for use in specific operating environments The units must be installed in accordance with these instructions must be correctly certified for the specific operating environment an...

Страница 2: ...pper plugs these must be parallel thread have a minium of 5 full thread engagement and be of a medium fine tolerance to ISO965 1 and ISO965 3 The cable entry devices selected must maintain the IP rati...

Страница 3: ...the fixing points must be suitable for the conditions of use Nemalux recommend using M8 Marine Grade A4 Stainless Steel fixings not supplied RF Series 12 Floodlight RF Series 24 Emergency Variant Show...

Страница 4: ...e floodlight It is very important that the red fibre washers are fitted between the RF housing and the mounting bracket The unit must be aligned first before securing the bracket and bolts tightened t...

Страница 5: ...standard luminaires Typical wiring diagram emergency luminaires WHITE RED WHITE RED WHITE RED WHITE RED 5 12 www nemalux com sales nemalux com Tel 403 242 7475 Fax 403 243 6190 SUBJECT TO CHANGE WITH...

Страница 6: ...g cable glands when illuminated the green LED indicates that the emergency system is healthy 9 The battery fuse located in the power supply lid on emergency variants is disconnected after final manufa...

Страница 7: ...RF unit from the mains supply and allow to cool before carrying out any maintenance work 4 The unit has 2 independent power supplies in the event that a power supply needs to be replaced the cables t...

Страница 8: ...TEX and IECEx and UKEX Rating See below CML17ATEX4231 or IECEx CML 17 0135 or CML 21UKEX4106 II 3 GD Ex ec mc IIC T4 Gc Ta 50 C to 55 C standard variants II 3 GD Ex ec mc IIC T4 Gc Ta 20 C to 55 C eme...

Страница 9: ...blown 5 If LED panel fails to light is it possible to identify if problem is with LED panel or power supply by swapping LED cables to opposite power supply to help identify problem Max number of fitt...

Страница 10: ...Zone 1 CML13ATEX3007 IEC Ex CML14 0001 CML21UKEX3099 Zone 2 CML17ATEX4231 IEC Ex CML17 0135 CML21UKEX4106 ATEX Quality Assurance Notification CSA BV 2813 UKCA Quality Assurance Notification CSA UK 05...

Страница 11: ...60079 0 2018 EN 60079 7 2015 A1 2018 EN 60079 18 2015 A1 2017 EN 60079 31 2014 EN 60079 1 2014 And also 2014 35 EU Low Voltage Directive 2014 30 EU EMC Directive Signed 11 12 www nemalux com sales nem...

Страница 12: ...2589 P 1 403 242 7475 F F 1 403 243 6190 E info nemalux com W www nemalux com Industrial LED Lighting designed to solve harsh and hazardous lighting challenges 12 12 www nemalux com sales nemalux com...

Отзывы: