background image

Floodlight Range Installation Guide 

Zone 1 variant CML13ATEX3007 or IEC Ex CML14.0001 or CML 21UKEX3099 

      

Zone 2 variant CML17ATEX4231 or IEC Ex CML 17.0135 or CML 21UKEX4106

This installation guide provides instructions for installing the RF series of 

explosion protected floodlights. 

Text in 

Bold

 is specific for emergency variants

Overview 

1

 

Safety Instructions 

2

 Installation 

3

 Maintenance 

4

 

Technical  Specification 

5

 

Trouble Shooting

Important information

The RF series of explosion protected floodlights are specialist devices, certified for use 

in specific operating environments. 

The units must be installed in accordance with these instructions, must be correctly 

certified for the specific operating environment and must be installed by suitably 

qualified personnel.

 

Emergency floodlights will require the fuse to be reconnected upon installation 

and the floodlight subjected to three 24 hour charge/discharge cycles to bring 

the battery up to peak capacity.

 

If you have any queries about the installation or the certification of the unit – please 

contact Nemalux for immediate assistance and advice.

R

F

 

Series

rev. A-

2

1

1

-

1

2

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

SUBJECT TO CHANGE WITHOUT NOTICE

MADE IN 

UK

Содержание RF Series

Страница 1: ...ist devices certified for use in specific operating environments The units must be installed in accordance with these instructions must be correctly certified for the specific operating environment an...

Страница 2: ...pper plugs these must be parallel thread have a minium of 5 full thread engagement and be of a medium fine tolerance to ISO965 1 and ISO965 3 The cable entry devices selected must maintain the IP rati...

Страница 3: ...the fixing points must be suitable for the conditions of use Nemalux recommend using M8 Marine Grade A4 Stainless Steel fixings not supplied RF Series 12 Floodlight RF Series 24 Emergency Variant Show...

Страница 4: ...e floodlight It is very important that the red fibre washers are fitted between the RF housing and the mounting bracket The unit must be aligned first before securing the bracket and bolts tightened t...

Страница 5: ...standard luminaires Typical wiring diagram emergency luminaires WHITE RED WHITE RED WHITE RED WHITE RED 5 12 www nemalux com sales nemalux com Tel 403 242 7475 Fax 403 243 6190 SUBJECT TO CHANGE WITH...

Страница 6: ...g cable glands when illuminated the green LED indicates that the emergency system is healthy 9 The battery fuse located in the power supply lid on emergency variants is disconnected after final manufa...

Страница 7: ...RF unit from the mains supply and allow to cool before carrying out any maintenance work 4 The unit has 2 independent power supplies in the event that a power supply needs to be replaced the cables t...

Страница 8: ...TEX and IECEx and UKEX Rating See below CML17ATEX4231 or IECEx CML 17 0135 or CML 21UKEX4106 II 3 GD Ex ec mc IIC T4 Gc Ta 50 C to 55 C standard variants II 3 GD Ex ec mc IIC T4 Gc Ta 20 C to 55 C eme...

Страница 9: ...blown 5 If LED panel fails to light is it possible to identify if problem is with LED panel or power supply by swapping LED cables to opposite power supply to help identify problem Max number of fitt...

Страница 10: ...Zone 1 CML13ATEX3007 IEC Ex CML14 0001 CML21UKEX3099 Zone 2 CML17ATEX4231 IEC Ex CML17 0135 CML21UKEX4106 ATEX Quality Assurance Notification CSA BV 2813 UKCA Quality Assurance Notification CSA UK 05...

Страница 11: ...60079 0 2018 EN 60079 7 2015 A1 2018 EN 60079 18 2015 A1 2017 EN 60079 31 2014 EN 60079 1 2014 And also 2014 35 EU Low Voltage Directive 2014 30 EU EMC Directive Signed 11 12 www nemalux com sales nem...

Страница 12: ...2589 P 1 403 242 7475 F F 1 403 243 6190 E info nemalux com W www nemalux com Industrial LED Lighting designed to solve harsh and hazardous lighting challenges 12 12 www nemalux com sales nemalux com...

Отзывы: