background image

2

   

  

INSTALLATION REQUIREMENTS

Locate a level floor position ahead of piping into water heater for placement.
Unit must be installed at least 10 feet ahead of the inlet to a water heater to prevent damage due to back-up hot 

water. DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur!
Locate the unit near an 

unswitched

, 120 volt / 60 Hz grounded electrical outlet.

Check for distance and proper drain installation (e.g. floor drain, washing machine standpipe). Determine type and 

size of piping required for filter connection (e.g. copper, galvanized, PVC plastic).

NOTE:

 If household plumbing is galvanized and you intend to make the installation with copper (or vice versa), 

obtain dielectric unions to prevent dissimilar metal corrosion.

CAUTION:

 If sweat soldering copper pipe (remember to always use lead free solder and flux), cover yoke and 

bypass valve with wet rags to prevent heat damage to connections and control valve. If using PVC or plastic pipe, 

primers and solvent cements specifically recommended for use with potable water are required.

NOTE:

 All plumbing lines not requiring “soft” water should be connected “upstream” of the softener, if installed. 

(See Typical Installation Diagrams.)

  

  

TYPICAL TWO SYSTEM ILLUSTRATION

(Incoming Water From Left Side)

Installation Requirements  

AIO Plus Connected Series

Содержание AIO Plus Connected Series

Страница 1: ...Installation Operation Manual...

Страница 2: ...th Page 6 8 Programming the Control Valve Page 9 11 Powerhead Assembly Page 12 Valve Body Assembly Page 13 Valve Body Assembly Parts List Page 14 Bypass Assembly Page 14 Service Instructions Page 15 1...

Страница 3: ...silicone grease be used as a lubricant for all control valves Dow Corning 7 Release Com pound is used in the manufacture of the control valves Part DOW 7 Sealants Pipe dope and liquid thread sealers m...

Страница 4: ...pper galvanized PVC plastic NOTE If household plumbing is galvanized and you intend to make the installation with copper or vice versa obtain dielectric unions to prevent dissimilar metal corrosion CA...

Страница 5: ...e I Replace control valve on mineral tank 3 Turn OFF main water supply and OPEN nearest faucet to relieve pressure 4 Cut main line and install appropriate elbows and extensions CAUTION Raised arrows l...

Страница 6: ...flow down through mineral tank and out the drain line Let it continue to run for the entire rapid rinse step There may be colored water or media fines during this initial flow 4 Once the rapid rinse e...

Страница 7: ...ed to be cleaned of the precipitated iron that has been collected in them or iron bleed through may be a problem We suggest all tanks be drained and flushed thoroughly Annual Maintenance Annual replac...

Страница 8: ...connect to it the app will ask you to enter the password After entering it the first time you should not need to enter it again unless it changes 3 BTLE Valve devices can be updated by the app When t...

Страница 9: ...neration Time Example Midnight just type 12 then press OK Advanced Settings NOTE Consult your dealer before making any changes We do not recommend changing Advanced Settings unless you have a good und...

Страница 10: ...void the user s authority to operate the equipment NOTE This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to Part 15 of the FCC Rules These limit...

Страница 11: ...at the set Backwash Time A 0 setting will cancel this feature The Max Value for this item is 29 Example Backwash every 7 days A 07 Factory Setting Cancel setting A 00 To Adjust this Value Press the Se...

Страница 12: ...is turned off to conserve battery power during this time To confirm that the battery is working press either button and the display will turn on for five 5 seconds If power failure occurs while syste...

Страница 13: ...3 To Fast Cycle through regeneration First complete above 2 steps Press and hold the Set Change button for 3 seconds to advance to the next cycle step NOTE Fast Cycle is not necessary unless desired...

Страница 14: ...2 Encoder 20001X124 1 3 Front Plate 20001X004 1 4 Encoder Wheel 20001X007 1 5 Main Gear 21001X120 1 6 Power Supply CS TRANS 1 7 Back Plate 20001X005 1 8 Lower Front Base for Cover 20111X002 1 9 Motor...

Страница 15: ...13 AIO Plus Connected Series Valve Body Assembly VALVE PARTS LIST ON FOLLOWING PAGE 29 28 27 26 26 25 22 23 24 22 22 21B 21A 20 19 18 17 17 16 15 14 13 12 11 10 9 8 6 5 4 3 2 1...

Страница 16: ...001 2 18 Injector Screen 20001X222 1 19 Tank O Ring 20561X205 1 20 Distributor Tube O Ring 20561X204 1 21a Flow Meter CS METER 1 21b Flow Meter Plug 20017X201 1 22 3 8 Push Lock 90 Elbow GA Q0620626BV...

Страница 17: ...onnect the meter signal wire from the circuit board 3 Remove lower back base screws and detach lower back base 4 Remove screw and washer at piston drive yoke Remove powerhead mounting screws The entir...

Страница 18: ...or too slow or high service flow Check for media fouling Lack of aeration in water Program valve to draw air more frequently Increase number of minutes in air draw cycle Clean injection assembly and s...

Страница 19: ...ear the error code Manually cycle the powerhead through the regeneration cycle steps to verify that the motor can cycle properly while the powerhead is disconnected from the valve body If the error 3...

Страница 20: ...ers installed for residential use Water conditioners installed for commercial or industrial applications are guaranteed for one 1 year from the date of installation 2 Installation must be made in acco...