vii
Important Information
Clearance for Installing the Projector
Allow ample clearance between the projector and its surroundings as shown below.
The high temperature exhaust coming out of the device may be sucked into the device again.
Avoid installing the projector in a place where air movement from the HVAC is directed at the projector.
Heated air from the HVAC can be taken in by the projector's intake vent. If this happens, the temperature inside the
projector will rise too high causing the over-temperature protector to automatically turn off the projectors power.
Example 1 – If there are walls on both sides of the projector.
30 cm/11.8" or greater
30 cm/11.8" or greater
Intake vent
Exhaust vent
NOTE:
The drawing shows the proper clearance required for the front, back and top of the projector.
Example 2 – In the case of portrait projection.
Intake vent
Safety cover
30 cm/11.8" or greater
NOTE:
• The drawing shows the proper clearance required for the front, back and top of the projector.
for an installation example on portrait projection.