8
Express5800/1080Xd Installation Procedures
8.
Cut and remove the plastic stretch film that is wrapped around the server.
See Figure 4C.
9.
Remove the unloading ramp and set it aside. See Figure 5A.
10.
A metal ramp plate is attached to the unloading ramp. Release the Velcro
strips and remove the ramp plate from the unloading ramp. See Figure 5B.
A
B
A
Unloading Ramp
B
Velcro Strips and Ramp Plate
Figure 5. Removing the Unloading Ramp
11.
Four Styrofoam stoppers prevent the server from moving during shipment.
Wing nuts secure Styrofoam stoppers, located on both sides of the server as
well as the front and rear of the server, to the shipping pallet. Remove the
four wing nuts and remove the stoppers and set them aside. See Figure 6A.
12.
A plastic sheathing secured with tape, protects the bottom sides of the
server. Remove the tape and then cut and remove the bottom sheathing. Be
careful not to damage the upper vinyl shroud. Be sure the bottom sheathing
is free and clear of the server wheels and levelers. See Figure 6B.
Содержание NEC Express5800 Series
Страница 1: ...I n s t a l l a t i o n P r o c e d u r e s EXPRESS5800 1080Xd...
Страница 4: ......
Страница 22: ......
Страница 23: ...xx...
Страница 24: ...455 01691 000...