6
Express5800/1080Xd Installation Procedures
2.
Plastic straps secure the shipping box around the server. Carefully cut and
remove the plastic straps securing the sides and top of the shipping
container. See Figure 2A. It is recommended that you wear gloves and
protective eye wear when cutting the plastic straps.
A
A
A
Plastic Straps
Figure 2. Shipping Container Plastic Straps
3.
Lifting upwards, remove top shipping cover. See Figure 3A.
4.
Release the Velcro tapes that secure the front, rear, and side covers of the
shipping box. See Figure 3B.
5.
Remove the shipping container surrounding the server and set it aside. See
Figure 3C.
Содержание NEC Express5800 Series
Страница 1: ...I n s t a l l a t i o n P r o c e d u r e s EXPRESS5800 1080Xd...
Страница 4: ......
Страница 22: ......
Страница 23: ...xx...
Страница 24: ...455 01691 000...