AD-25182501
CHAPTER 3
Page 111
Revision 1.0.1
NAP- 200-010
Sheet 1/1
Operation Test
1.
Operation Test
Confirm the system data accuracy and hardware configuration (including cable connections) by the following
operation test:
• Basic Connection Test at MDF
- Station Line Test (Operator Call from all stations)
- Central Office Trunk Test (Incoming, Outgoing)
Tie Line Trunk Test (Incoming, Outgoing)
• Service Feature Test
- Call Transfer
- Step Call
- Executive Right of Way
- Call Hold
- Call Back
- Call Forwarding-All Calls/Don’t Answer/Busy Line
- Call Pickup
- Station Hunting-Pilot/Circular
- Speed Calling-System/Station
- Paging Access
- Announcement Service etc.
- Music on Hold
- Background Music
- TAS/Night Service