AD-25182501
CHAPTER 3
Page 32
Revision 1.0.1
NAP- 200-003
Sheet 14/29
Installation of Main Equipment
Figure 003-15 Modular Layout for 5 PIM Configuration
Notes:
- MDF cable lengths:
PIM's 0 to 3 = 1.5 m
PIM 4 and 5 = 2.5 m
- PIM 5 - LTC 0 connect to
(L) Krone (MDF 2)
- LTC 1-2 connect to
(R) Krone (MDF 2).
- 240V connect to 4 way
powerboard.
- BATTM0 and/or BATTM1 can
be supplied for external battery
backup either as MIN. or MED.
backup configuration.
- If BATTM0 or BATTM1 is not
required use dummy module
(1 ONLY).
- If a 78 A-H Battery is requried,
add only one more BATTM
(for PIM's 0 to 3).
-
+
-
+
-
+
PS12260
-
+
BATTM1
TO
PIM4 PWR
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF0
or
TPF0
PIM1
PWR SUPPLY
100
Pair
(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)
PIM2
LTC1
LTC2
PWR SUPPLY
MDF0(R)
MDF0(R)
MDF1(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF1
or
TPF1
100
Pair
(L)
LTC0
LTC1
LTC2
MDFO(L)
MDF0(R)
MDFO(R)
PIM3
LTC1
LTC2
PWR SUPPLY
MDF1(L)
MDF1(L)
MDF1(L)
LTC0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
LTC0
PWR SUPPLY
LTC0
LTC1
LTC2
MDF0(L)
MDF0(L)
MDF0(L)
+
-
PIM0
PS12260
SHELF 1
MIN. BACKUP,
26 A-H
SHELF 2
MED. BACKUP
(SHELF 1+2),
52 A-H
BATTM0
TO
PIM0 PWR
PWR SUPPLY
LTC0
LTC1
LTC2
MDF2(L)
MDF2(L)
MDF2(L)
+
-
PIM4
240V AC
PWR SUPPLY
LTC0
LTC1
LTC2
MDF2(L)
MDF2(R)
MDF2(R)
PIM5
240V AC
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF2
or
TPF2
100
Pair
(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)