1. Installing Internal Optional Devices
Express5800/T110i-S User’s Guide
35
Chapter 2 Preparations
1.2
Overview of Installation and Removal
Install/remove components by using the following procedure.
1.
Turn the server off.
See
Chapter 3
(6.
Turning off the Server
).
2.
Disconnect the power cord from the outlet and the server.
3.
Disconnect all cables connected to the connector at the rear.
4.
Remove the side cover.
See
Chapter 2 (1.3. Removing the Side Cover)
.
5.
Remove the front bezel.
See
Chapter 2 (1.4 Removing the Front Bezel)
.
6.
Depending on the components to be installed or removed, follow the procedure in order.
See
Chapter 2
to
High Temperature Resistant kit
).
7.
Connect
cables
See
Chapter 2
.
8.
Attach the front bezel.
See
Chapter 2 (1.16 Attaching the Front Bezel).
9.
Attach the side cover.
See
Chapter 2
(1.17 Installing the Side Cover)
.
Continue the setup while referring to
Chapter 2 (2.2 Connection)
.