9-10 Upgrading Your Server
12.
Put the CPU on the socket carefully and slowly.
NOTE:
Note the direction of the CPU. To prevent the CPU from being
inserted into the mating socket incorrectly, a pin mark is put on each of
the CPU and the socket. Check the pin marks to insert the CPU into the
socket correctly.
13.
Push the CPU lightly to the socket, and push down the CPU socket holder.
14.
Push down the lever to secure the CPU.
Содержание Express5800/B120a
Страница 14: ...viii This page is intentionally left blank ...
Страница 97: ...Configuring Your Server 4 47 Property of Hard disk drive of Universal RAID Utility ...
Страница 136: ...4 86 Configuring Your Server This page is intentionally left blank ...
Страница 166: ...5 30 Installing the Operating System with Express Setup 5 Select Perform the Express setup from the Top Menu click Next ...
Страница 192: ...5 56 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 201: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 216: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Страница 222: ...7 6 Maintenance This page is intentionally left blank ...
Страница 258: ...8 36 Troubleshooting This page is intentionally left blank ...
Страница 296: ...9 38 Upgrading Your Server This page is intentionally left blank ...
Страница 298: ...A 2 Specifications This page is intentionally left blank ...
Страница 369: ...Installing the Operating System B 71 4 Activate Windows The Windows activation is complete ...
Страница 373: ...Installing the Operating System B 75 3 Process Windows activation according to the following message ...
Страница 374: ...B 76 Installing the Operating System This page is intentionally left blank ...