Troubleshooting 8-9
Did you turn on the power of Blade Enclosure within 30 seconds after AC power is
supplied to each power unit?
→
Initialization of BMC takes about 30 seconds after AC power is supplied to the
CPU blade. After making sure that the AC power is supplied to the CPU blade (the
POWER lamp lit amber), wait for about 30 seconds or longer, then turn on the
power of Blade Enclosure by using the POWER switch.
Immediately after the power is supplied to the CPU blade, the CPU blade in the slot
having the larger number is delayed.
→
Initialization of BMC is performed for about 30 seconds after power-on of CPU
blade. After that, the CPU blades are powered on sequentially. At power-on
sequence, a waiting time {(slot number - 1)
×
2 seconds} is inserted between
blades. Accordingly, the CPU blade in the slot having the larger number is
delayed.
It occasionally takes time from power-on operation to CPU blade to turning on the
power supply.
→
When power-on operation is executed, the CPU blade notifies the EM card of it,
and wait for permission. If the EM card is processing other task and it is busy,
permission for power-on is delayed.
The remote power-on through network does not work (Wake On LAN does not work):
Is the system shut down forcibly?
→
After the forced shutdown (or pressing the POWER switch on the CPU blade
brings the power of the CPU blade to be turned off forcibly), Wake On LAN does
not work. After starting the CPU blade once, perform the normal shutdown
processing.
Fail to power-off:
Is the POWER switch function disabled?
→
Restart the CPU blade once and then start the BIOS SETUP utility.
<Menus to check: [Security] – [Power Switch Inhibit]>
Содержание Express5800/B120a
Страница 14: ...viii This page is intentionally left blank ...
Страница 97: ...Configuring Your Server 4 47 Property of Hard disk drive of Universal RAID Utility ...
Страница 136: ...4 86 Configuring Your Server This page is intentionally left blank ...
Страница 166: ...5 30 Installing the Operating System with Express Setup 5 Select Perform the Express setup from the Top Menu click Next ...
Страница 192: ...5 56 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 201: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 216: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Страница 222: ...7 6 Maintenance This page is intentionally left blank ...
Страница 258: ...8 36 Troubleshooting This page is intentionally left blank ...
Страница 296: ...9 38 Upgrading Your Server This page is intentionally left blank ...
Страница 298: ...A 2 Specifications This page is intentionally left blank ...
Страница 369: ...Installing the Operating System B 71 4 Activate Windows The Windows activation is complete ...
Страница 373: ...Installing the Operating System B 75 3 Process Windows activation according to the following message ...
Страница 374: ...B 76 Installing the Operating System This page is intentionally left blank ...