Express5800/120Ed Rack Mount installation Procedures 16
Figure 12. Removing the Device Bay Door
5.
Remove the three screws that secure three small brackets located at the top
of the new front bezel. See Figure 13. Save the screws and brackets for use
in Step 8.
6.
Carefully tilt and insert the bottom tab hooks of the front bezel into the
corresponding bottom tab slots in the front of the server unit (see Figure 13).
If necessary, loosen the screws on the bottom screw brackets of the front
bezel so that the tab hooks can be easily aligned to go into the bottom tab
slots of the server unit.
!
CAUTION
Be careful not to damage LEDs protruding out from the front
of the chassis
7.
Pivot the top edge of the front bezel up towards the top edge of the server
unit until its top metal tabs protrude through the top tab slots.
8.
Place a screw bracket over one of the top metal tabs with its back edge up
against the inside of the chassis and secure it with a screw. Repeat this step
for the other top metal tabs.
Содержание Express 5800/120Ed
Страница 1: ...Express5800 120Ed Rack Mount Kit Installation Procedures PN 455 01607 001 ...
Страница 4: ......
Страница 28: ......
Страница 29: ......