![background image](http://html.mh-extra.com/html/nec/express-320lc/express-320lc_user-manual_251148053.webp)
Windows Setup
4-9
<When the AC power is off (The power cord is not plugged into the outlet)>
Connect the power cords to NEC Express5800/ft series in the following order:
(1) Connect the power cord to the AC inlet B (for Group1)
(2) Connect the power cord to the AC inlet A (for Group2)
(3) Confirm that the POWER switch of the PCI module for Group1 is illuminated.
(4) Make sure that the two BMC Status LEDs for PCI modules (for Group1/for Group2) are
turned off.
IMPORTANT:
If the BMC Status LED is red and blinking, start the ft series
setup after the LED is turned off. Otherwise the setup may not be done properly.
Preparation is now completed. Start the ft series setup.
<When the AC power is on (The power cords are plugged to the wall outlet and the main
unit’s power is off)>
(1) Check the LED of the PCI module’s POWER switch.
•
If the PCI module for Group1’s POWER switch is lit, PCI module for Group1 is
primary. Preparations are complete. Start the ft series setup.
•
If the PCI module for Group2’s POWER switch is lit, the PCI module for Group1 is
secondary. Continue to (2). Make PCI module for Group1 the primary module.
AC inlet A (for
Group2)
AC inlet B (for
Group1)
Rear View
Содержание Express 320Lc
Страница 1: ...N8800 063E 064E NEC Express5800 320Lc 320Lc R User s Guide Setup 1st Edition 12 2004 856 124610 001 A ...
Страница 15: ...Before Using 1 3 Label D Label C Label E Label A Label B ...
Страница 16: ...1 4 Before Using Rack mount Model Label C Label A Label B Label D Label E Label D Label E Label C Label B ...
Страница 18: ...1 6 Before Using PCI CPU Modules PCI Module CPU Module Label A Label A Label A Label A ...
Страница 32: ...2 4 About Operating System This page is intentionally left blank ...
Страница 44: ...3 12 Installing Server This page is intentionally left blank ...
Страница 100: ...4 56 Windows Setup ...
Страница 102: ...4 58 Windows Setup This page is intentionally left blank ...