Redundant Power Upgrade Kit Installation Procedures 17
Installing the Redundant Power Supplies
Install the two redundant power supplies in the server as follows:
Perform the following procedures for each power supply.
1.
Attach the two power supply cables to the connector bracket on the back of
the power supply carrier supplied with your kit (see the following figure).
Attaching the Two Power Supply Cables
2.
Secure the power supply to the carrier with four screws on the rear carrier
plate and two screws on the front supporting brackets of the power supply
(see the following figure).
Attaching the Power Supply to the Carrier
3.
Slide the power supply carrier into the power supply slot and secure with the
three thumbscrews.
Содержание 455-01593-000
Страница 1: ...Installation Guide Redundant Power Upgrade Kit PN 455 01593 000 ...
Страница 4: ...NEC ...
Страница 8: ...6 Redundant Power Upgrade Kit Installation Procedures Removing a Server Side Panel ...
Страница 11: ...Redundant Power Upgrade Kit Installation Procedures 9 Removing the Power Supply Blank Mounting Plate ...