Redundant Power Upgrade Kit Installation Procedures
Installing Interlock Switches
To install interlock switches attach the cable connector previously removed
from J5 on the SCSI backplane to J13 on the power controller board (see the
following figure). Also, see step 1 in paragraph "Unplugging the Intrusion
Switches and Installing Jumpers" for cable connector previously removed from
J5 on the SCSI backplane.
Installing Interlock Switches Cable