3.
Attach the main power cable (A) that comes from the system board power
connector (see list below) to J9 on the power controller board (see the figure
below). Secure the cable by threading a tie wrap (B) through tie wrap clamp
(C) and around the cable, and tighten. Trim the plastic tie wrap.
For 120Mc2 System Board use the power cable from power connector P23.
For 120Mc3 System Board use the power cable from power connector P28.
4.
Attach the back plane power cable (D) that comes from J4 on the SCSI
backplane to J6 on the power controller board (see the figure below). Secure
the cable by threading a tie wrap (E) through tie wrap clamp (F) and around
the cable, and tighten. Trim the plastic tie wrap.
Attaching the Power Controller Board Cables
Содержание 455-01593-000
Страница 1: ...Installation Guide Redundant Power Upgrade Kit PN 455 01593 000 ...
Страница 4: ...NEC ...
Страница 8: ...6 Redundant Power Upgrade Kit Installation Procedures Removing a Server Side Panel ...
Страница 11: ...Redundant Power Upgrade Kit Installation Procedures 9 Removing the Power Supply Blank Mounting Plate ...