Issue 2 December 1995
8-1
8
Switch Integration Device
Administration
The instructions in this chapter explain how to configure the SID to integrate with
an NEAX 2400 MCI switch and an INTUITY System. The installation technician
administers the SID based on NEAX switch administration information provided
by the customer. As you administer the SID configuration, you must perform the
following tasks:
■
Administer the basic parameters
— Number of voice mail ports
— Message desk number
— CPID pad string
— MWI pad string
— MWI feature
■
Administer the extensions and logical terminal numbers
■
Save and start the configuration
■
Administer the serial data links
■
Set the security level
■
Change the system parameters
— Set the date and time
— Adjust the LCD contrast
Содержание 2400
Страница 2: ...Blank Page...
Страница 8: ...Contents viii Issue 2 December 1995...
Страница 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics...
Страница 42: ...3 6 Issue 2 December 1995 Switch Integration Planning...
Страница 52: ...4 10 Issue 2 December 1995 Hardware Installation...
Страница 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration...
Страница 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration...
Страница 122: ...A 10 Issue 2 December 1995...
Страница 128: ...B 6 Issue 2 December 1995...
Страница 140: ...Abbreviations ABB 6 Issue 2 December 1995...