Issue 2 December 1995
1-9
System Configuration
NEC NEAX 2400 MCI Hardware
The customer must provide the correct switch and related components as
described in Table 1-3. All required items should be available and configured
before an AT&T technician arrives to install the INTUITY system. The INTUITY
system integrates only with the NEC NEAX 2400 switch and related components
described in Table 1-3
.
Table 1-3. NEAX Switch Required Components
Component
Description
AT&T
Supplied
Customer
Supplied
NEAX 2400 MCI
Switch
■
Models UMG and MMG with software
level 4000 or greater with support for
the MCI link
■
Models SIM and IMG with software
level 5200 or greater with support for
the MCI link
■
The switch must have the 5200
Feature Application Floppy Disk
software installed. After installing the
software, reboot the switch.
X
MCI Digital Port
Configure an I/O port, for example
PA-IO02, as the MCI link
X
PA-16LCQ analog
ports
PA-16LCQ recommended because it can
be programmed to provide loop current
disconnect. An analog port is required
for each voice port. An analog port is
also needed for the internal modem on
the SID.
X
Содержание 2400
Страница 2: ...Blank Page...
Страница 8: ...Contents viii Issue 2 December 1995...
Страница 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics...
Страница 42: ...3 6 Issue 2 December 1995 Switch Integration Planning...
Страница 52: ...4 10 Issue 2 December 1995 Hardware Installation...
Страница 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration...
Страница 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration...
Страница 122: ...A 10 Issue 2 December 1995...
Страница 128: ...B 6 Issue 2 December 1995...
Страница 140: ...Abbreviations ABB 6 Issue 2 December 1995...