Hardware Installation
This chapter describes the hardware and cable installation tasks required to
integrate the NEAX 2400 MCI switch with an INTUITY System through a switch
integration d evice (SID). Before you proceed with the instructions in this chapter,
verify that the hardware has been installed and that all required steps have been
completed on one of the following checklists:
■
INTUITY MAP/5 Installation Checklist,
585-310-147
■
INTUITY MAP/40 Installation Checklist,
585-310-141
■
INTUITY MAP/100 Installation Checklist,
585-310-137
This chapter covers the installation of all integration-related hardware
components. The tasks must be performed by the AT&T installation technician,
the customer, or the customer’s switch technician. Each task provides an
explanation of who should perform the task.
The hardware installation tasks covered in this chapter include:
■
Connect an analog line to the modem
■
Connect the MCI line to the switch
■
Connect the MCI cable to the A25B cable
■
Connect the Null cable and the Y-cable to the SID
■
Connect the SID to the INTUITY system
■
Connect the SID power cord
Continue with the instructions on the next page to install the hardware.
Содержание 2400
Страница 2: ...Blank Page...
Страница 8: ...Contents viii Issue 2 December 1995...
Страница 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics...
Страница 42: ...3 6 Issue 2 December 1995 Switch Integration Planning...
Страница 52: ...4 10 Issue 2 December 1995 Hardware Installation...
Страница 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration...
Страница 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration...
Страница 122: ...A 10 Issue 2 December 1995...
Страница 128: ...B 6 Issue 2 December 1995...
Страница 140: ...Abbreviations ABB 6 Issue 2 December 1995...