
Preventive Maintenance
E-46
System Support Log
Preventive Maintenance
This section is for entering preventive maintenance activities.
The primary purpose of preventive maintenance is to keep unscheduled
interruptions to a minimum. Following a well-planned preventive maintenance
program can help you maintain a high level of system performance at a
minimum cost.
This section provides the following information and forms:
•
General customer preventive maintenance guidelines
•
General customer preventive maintenance procedures
•
Preventive Timetable Worksheets
•
Forms for recording preventive maintenance reference manuals and
procedures
It is important for you to perform preventive maintenance on a regular basis.
This section includes a form for listing the materials and equipment required
to perform preventive maintenance on each piece of equipment and a brief
description of the procedure.
You should establish a preventive maintenance schedule when the system is
installed. Take the environment into consideration. For example, if you have
an extremely dusty environment, the system will require more frequent
cleaning. Use the Preventive Timetable Worksheets provided to record the
schedule.
General Customer Preventive Maintenance Guidelines
General customer preventive maintenance guidelines are as follows:
Central Processor Unit (CPU)
Clean CPUs on a regular basis to prevent heat build-up due to dust on
electronic components. Use a high quality cleaner prescribed for computer
equipment.
Содержание S26
Страница 1: ...BST0 2140 4700 12 97 NCR S26 Hot Plug Server User Guide Release 3...
Страница 11: ...NCR S26 Hot Plug Server User Guide 1 1 Chapter 1 Installation and Documentation Overview...
Страница 19: ...NCR S26 Hot Plug Server User Guide 2 1 Chapter 2 Using System Features...
Страница 33: ...NCR S26 Hot Plug Server User Guide 3 1 Chapter 3 Adding and Replacing Components...
Страница 52: ...Installing Drives 3 20 Adding and Replacing Components Figure 3 10 Securing the Drive...
Страница 54: ...Installing Drives 3 22 Adding and Replacing Components Figure 3 12 Inserting the Drive into the Drive Bay...
Страница 56: ...Installing Drives 3 24 Adding and Replacing Components...
Страница 57: ...NCR S26 Hot Plug Server User Guide 4 1 Chapter 4 Using the BIOS Setup Utility...
Страница 91: ...NCR S26 Hot Plug Server User Guide 5 1 Chapter 5 Using the System Utilities...
Страница 109: ...NCR S26 Hot Plug Server User Guide A 1 Appendix A 420 Watt Power Supply Requirements...
Страница 112: ...Output Requirements A 4 420 Watt Power Supply Requirements...
Страница 113: ...NCR S26 Hot Plug Server User Guide B 1 Appendix B Error Messages...
Страница 119: ...NCR S26 Hot Plug Server User Guide C 1 Appendix C Sample Configurations...
Страница 141: ...NCR S26 Hot Plug Server User Guide D 1 Appendix D Hot Plug Backplane...
Страница 161: ...NCR S26 Hot Plug Server User Guide E 1 Appendix E System Support Log...
Страница 188: ...Software Records E 28 System Support Log This page intentionally left blank...
Страница 219: ...Index NCR S26 Hot Plug Server User Guide Index 3 V Ventilation 2 7...
Страница 220: ...Index Index 4 NCR S26 Hot Plug Server User Guide...