
Sample Standard Configuration
NCR S26 Hot Plug Server User Guide
C-11
1. Insert the EISA Configuration Utility in the diskette drive. Observe that
the EISA Configuration Utility boots properly.
2. Select NCR 3426 Dual Pentium System from the Advanced Configuration
menu.
Note: Refer to the “Viewing or Editing Configuration Details” section in
Chapter 5 for additional information on configuring memory.
The PCI Adapter IRQ values entered below do not set the IRQ level for
PCI Adapters.
Note: PCI Adapter IRQ settings are set in the BIOS Setup Utility. You enter
the IRQ settings in the EISA Configuration Utility so that the EISA
Configuration Utility does not assign IRQ values to EISA Adapters that have
already been used for PCI Adapters.
Make sure the parallel port and serial ports are configured the same way
as in the BIOS Setup Utility.
3. Configure the baseboard options as follows:
System BIOS Type
[RAM BIOS Enabled]
System Processor
[Pentium at 166 MHz]
Special System Parts
[Special System Parts]
EISA Reserved Devices
[EISA Reserved Devices]
System Memory Function
Base System Memory
[640K Base Mem]
8-16 MB System Memory
[16 MB System Memory]
16-64 MB System Memory
[Enabled]
Note: You should manually configure the system memory by enabling
appropriate memory ranges and using Ctrl + R to configure the memory site
within these memory ranges.
Mouse Port
[Enabled]
Keyboard Port
[Enabled]
Floppy Disk Controller
[Enabled]
Содержание S26
Страница 1: ...BST0 2140 4700 12 97 NCR S26 Hot Plug Server User Guide Release 3...
Страница 11: ...NCR S26 Hot Plug Server User Guide 1 1 Chapter 1 Installation and Documentation Overview...
Страница 19: ...NCR S26 Hot Plug Server User Guide 2 1 Chapter 2 Using System Features...
Страница 33: ...NCR S26 Hot Plug Server User Guide 3 1 Chapter 3 Adding and Replacing Components...
Страница 52: ...Installing Drives 3 20 Adding and Replacing Components Figure 3 10 Securing the Drive...
Страница 54: ...Installing Drives 3 22 Adding and Replacing Components Figure 3 12 Inserting the Drive into the Drive Bay...
Страница 56: ...Installing Drives 3 24 Adding and Replacing Components...
Страница 57: ...NCR S26 Hot Plug Server User Guide 4 1 Chapter 4 Using the BIOS Setup Utility...
Страница 91: ...NCR S26 Hot Plug Server User Guide 5 1 Chapter 5 Using the System Utilities...
Страница 109: ...NCR S26 Hot Plug Server User Guide A 1 Appendix A 420 Watt Power Supply Requirements...
Страница 112: ...Output Requirements A 4 420 Watt Power Supply Requirements...
Страница 113: ...NCR S26 Hot Plug Server User Guide B 1 Appendix B Error Messages...
Страница 119: ...NCR S26 Hot Plug Server User Guide C 1 Appendix C Sample Configurations...
Страница 141: ...NCR S26 Hot Plug Server User Guide D 1 Appendix D Hot Plug Backplane...
Страница 161: ...NCR S26 Hot Plug Server User Guide E 1 Appendix E System Support Log...
Страница 188: ...Software Records E 28 System Support Log This page intentionally left blank...
Страница 219: ...Index NCR S26 Hot Plug Server User Guide Index 3 V Ventilation 2 7...
Страница 220: ...Index Index 4 NCR S26 Hot Plug Server User Guide...