background image

 

 

www.NavePoint.com 

[email protected] 

 

-

 

Squared Hole Mounting 

 

 

 

 

Locate the numbered square openings in the Equipment Mounting Frame (C) where you plan to install your 

equipment. Install M6 Cage Nuts (I) into the square openings to provide an attachment point for the M6 

Mounting Screws (H). Note: Consult your equipment documentation to determine how many cage nuts will 

be required and where they will need to be installed. 

a- 

From the inside of the Equipment Mounting Frame (C), insert one of the flanges of the cage nut through 

the square opening. Press it against the side of the square opening.  

b- 

Compress the cage nut at the sides slightly to allow the remaining flange to fit through the square opening. 

When the cage nut is properly installed, both flanges will protrude through the square opening and will be 

visible on the outer surface of the mounting rail. Repeat steps 1a and 1b until all required cage nuts are 

installed.

 

After installing the required cage nuts, use the included M6 Mounting Screws (H) to secure your equipment 

into the installed M6 Cage Nuts (I).

 

 

 

 

 

 

 

 

 

Содержание Swing Gate Wallmount Rack

Страница 1: ...y a qualified installer NavePoint cannot be held responsible for damage to equipment or personal injury resulting from improper use or installation of product Maintenance Check that the product is secure and safe to use at regular intervals at least every three months Limitations of Liability In no event will NavePoint LLC be liable for any damages whether direct or indirect special punitive incid...

Страница 2: ...m 1 Parts Identification A Wall Mounting Frame x2 B Horizontal Support Bar x2 C Equipment Mounting Frame x1 D E F G H M5 Screws x8 M4 Screws x8 Metal Sleeves x2 Plastic Sleeves x2 M6 Mounting Screws x10 I J M6 Cage Nuts x10 12 24 Mounting Screws x10 ...

Страница 3: ...vePoint com 3 customerservice navepoint com 2 Rack Assembly STEP 1 STEP 2 STEP 1 Attach the 2 Horizontal Support Bars B to the Wall Mounting Frames A using 8 M5 Screws D STEP 2 Secure them with 8 M4 Screws E ...

Страница 4: ...ert 2 Plastic Sleeves G into the holes on the upper Horizontal Support Bar B STEP 4 Secure the Equipment Mounting Frame C to the built frame make sure the latch pins click into both the Metal Sleeves F and the Plastic Sleeves G Note The Equipment Mounting Frame C can be installed with either the tapped screw holes or the squared holes facing forward for equipment mounting purposes ...

Страница 5: ...are spaced 17 75 451mm as reflected in the diagram Warning Do not attempt to mount to wall when equipment is already mounted inside the rack The rack can hold up to 100 pounds evenly distributed 50 pounds when Equipment Mounting Frame is in open position Make sure the wall surface can hold both the weight of the cabinet and the rack mounted equipment 4 Equipment Installation 1 Rack Unit ...

Страница 6: ... the inside of the Equipment Mounting Frame C insert one of the flanges of the cage nut through the square opening Press it against the side of the square opening b Compress the cage nut at the sides slightly to allow the remaining flange to fit through the square opening When the cage nut is properly installed both flanges will protrude through the square opening and will be visible on the outer ...

Страница 7: ...www NavePoint com 7 customerservice navepoint com Tapped Hole Mounting Use the included 12 24 Mounting Screws J to secure your equipment to the Equipment Mounting Frame C ...

Отзывы: