
11
Nautilus® Commercial Series Bike Assembly Manual
assembly guide
Step 3:
Locate the following for this step:
Parts:
• Display Console (A)
Hardware:
• Ref #4 Phillips Head Screw 1/4”x20 Qty. 4
• Ref #5 Spring Washer M6 Qty. 4
Tools:
• Phillips Head Screwdriver
3-1 Open the Ferrite Bead Housing (R) that is connected
to the Main Console Wire (Figure 3) and reconnect
it around all of the Heart Rate Wires and the Main
Console Wire (Figure 4). Confirm that O,P,Q and T
are the same length before closing the bead.
Do not include the TV Wires (S).
3-2 Plug the Main Console Wire (Q) into the large
connector labeled J5 (large connector) on the back
of the Console. (Figure 5&6)
3-3 The Right Heart Rate Wire (O) is labeled with an “R”.
Plug the Right Heart Rate Wire into the connector
labeled P1 on the back of the console. (Figure 5&6)
3-4 Plug the Left Heart Rate Wire (P) into the P2
connector. (Figure 5&6)
3-5 Plug the Center Heart Rate Wire (T) into the P3
connector. (Figure 5&6)
3-6 Gently push the excess wires back down into the
mast.
NOTE: If installing the optional LCD Monitor refer
to the NV915 installation manual at this
time. If not installing the LCD Monitor, tuck
the TV Cables (S) into the Mast.
3-7 Align the Console with the Mast, install and
completely tighten the hardware.
Figure 5:
A
O
S
P
5
Q
4
Figure 6:
P1
P2
P3
Figure 3:
Figure 4:
R
R
S
J5
T