VS300 Pre-installation Manual
Pre-installation assistance
Page 10-2
Issue 2.0 2010-12-01
•
Ac power wiring for the transmitter has been installed and connected at the breaker panel or
the building’s service entrance.
If local electrical codes allow Nautel personnel to connect the transmitter to the ac supply,
using the customer's cable, that task is included in this service. Otherwise, the customer must
ensure that an approved electrician is present for this task.
•
The customer has prepared the RF coaxial cable – used to connect the transmitter to the
antenna – and installed the required connector. The customer has also installed the RF
coaxial cable in place and connected it to the antenna, while leaving the transmitter end of
the cable unconnected.
•
Where required, all remote control and monitoring cables have been installed and connected
to the station equipment (e.g., modulation monitor, frequency monitor, and power meter).
•
The site has been made ready for the equipment, and adequate protection against lightning
and lightning-induced transients has been provided.
•
The following test equipment has been made available at the site:
– Two-channel oscilloscope (with probes)
– Audio signal generator
– Distortion analyzer
– Modulation monitor
– Frequency counter
– 50
Ω
test load (rated for 150% of carrier power, VSWR less than 1.1:1)
Nautel’s service representative takes full responsibility for commissioning the transmitter, validating
all external interfaces (i.e., the ac supply, RF output, remote control and monitoring equipment) and
checking out the equipment prior to activation. The service representative turns on the transmitter,
performs all adjustments and set-up procedures, and carries out
proof of performance
tests at the site.
These tests ensure that the transmitter is operating normally in compliance with its specifications.
The service representative also provides a demonstration and a short explanation of the operation of
the transmitter. Finally, the customer signs an
Acceptance of Installation Certificate
that provides feedback
to Nautel regarding the commissioning service.
Содержание VS300
Страница 2: ......
Страница 4: ......
Страница 8: ...VS300 Pre installation Manual Page viii Issue 2 0 2010 12 01...
Страница 10: ...VS300 Pre installation Manual Page x Issue 2 0 2010 12 01...
Страница 24: ...VS300 Pre installation Manual Pre installation tasks Page 2 4 Issue 2 0 2010 12 01...
Страница 32: ...VS300 Pre installation Manual Electrical requirements Page 5 4 Issue 2 0 2010 12 01...
Страница 34: ...VS300 Pre installation Manual RF output requirements Page 6 2 Issue 2 0 2010 12 01...
Страница 48: ...VS300 Pre installation Manual Planning for control and monitoring Page 8 10 Issue 2 0 2010 12 01...
Страница 52: ...VS300 Pre installation Manual Parts and tools Page 9 4 Issue 2 0 2010 12 01...
Страница 58: ...VS300 Pre installation Manual Pre installation assistance Page 10 6 Issue 2 0 2010 12 01...
Страница 61: ......