![Nautel NX5 AM Скачать руководство пользователя страница 81](http://html1.mh-extra.com/html/nautel/nx5-am/nx5-am_preinstallation-manual_3578150081.webp)
NX5 PRE-INSTALLATION MANUAL
PRE-INSTALLATION ASSISTANCE
PAGE 1.10.2
VERSION 0.1 2015-08-01
The customer has prepared the RF coaxial cable – used to connect the transmitter to the antenna –
and installed the required connector. The customer has also installed the RF coaxial cable in place
and connected it to the antenna, while leaving the transmitter end of the cable unconnected.
Where required, all remote control and monitoring cables have been installed and connected to
the station equipment (e.g., modulation monitor, frequency monitor, and power meter).
The site has been made ready for the equipment, and adequate protection against lightning and
lightning-induced transients has been provided.
The transmitter has been unpacked, closely checked for any damage caused by shipping, and then
assembled.
The following test equipment has been made available at the site:
Two-channel oscilloscope (with probes)
Audio signal generator
Distortion analyzer
Modulation monitor
Frequency counter
50
test load (rated for 150% of carrier power, VSWR less than 1.1:1)
Nautel’s service representative takes full responsibility for commissioning the transmitter, validating all
external interfaces (i.e., the ac supply, RF output, remote control and monitoring equipment) and
checking out the equipment prior to activation. The service representative turns on the transmitter,
performs all adjustments and set-up procedures, and carries out
proof of performance
tests at the site.
These tests ensure that the transmitter is operating normally in compliance with its specifications. The
service representative also provides a demonstration and a short explanation of the operation of the
transmitter. Finally, the customer signs an
Acceptance of Installation Certificate
that provides feedback
to Nautel regarding the commissioning service.
Содержание NX5 AM
Страница 2: ......
Страница 4: ......
Страница 8: ...NX5 PRE INSTALLATION MANUAL TABLE OF CONTENTS PAGE 1 VIII VERSION 0 1 2015 08 01 ...
Страница 10: ...NX5 PRE INSTALLATION MANUAL PAGE 1 X VERSION 0 1 2015 08 01 ...
Страница 22: ...NX5 PRE INSTALLATION MANUAL PAGE 1 XXII VERSION 0 1 2015 08 01 ...
Страница 75: ...NX5 PRE INSTALLATION MANUAL PLANNING CONTROL MONITOR CONNECTIONS PAGE 1 8 16 VERSION 0 1 2015 08 01 ...
Страница 79: ...NX5 PRE INSTALLATION MANUAL PARTS AND TOOLS PAGE 1 9 4 VERSION 0 1 2015 08 01 ...
Страница 85: ...NX5 PRE INSTALLATION MANUAL PRE INSTALLATION ASSISTANCE PAGE 1 10 6 VERSION 0 1 2015 08 01 ...
Страница 88: ......