
NX100 Installation Manual
Installing control/monitor wiring
Page 8-2
Issue 3.2 2017-03-31
Figure 8.1: Passing Audio Input Wiring Through Ferrite Toroids
Figure 8.2: Remote Cable Entry
7. Connect the appropriate control/monitor cable(s) to the connector(s) described in Section 8
of the
NX100 Pre-installation Manual
.. Secure wires to the existing cabling and to the panel
using arrowhead tyraps provided in the ancillary kit (see
tyrap anchor hole locations).
Program Input Cable
(to exciters panel)
LXP44 & LP23
ferrite toroids
REMOTE
CABLE
ENTRY
Содержание NX100
Страница 1: ...NX100 Transmitter Installation Manual Document NHB NX100 INS Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Installation Manual Page viii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Installation Manual Connecting transformer taps load wiring Page 3 6 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Installation Manual Adjusting the spark gap Page 6 4 Issue 3 2 2017 03 31...
Страница 38: ...NX100 Installation Manual Installing audio inputs Page 7 6 Issue 3 2 2017 03 31...
Страница 52: ...NX100 Installation Manual Parts and tools Page 10 4 Issue 3 2 2017 03 31...
Страница 62: ...NX100 Installation Manual Pre installation Installation assistance Page 11 10 Issue 3 2 2017 03 31...
Страница 65: ......