
NX100 Installation Manual
Preparing for installation
Page 1-2
Issue 3.2 2017-03-31
Figure 1.1: Flowchart - Installing the transmitter
Unpacking and positioning - see page 2-1
Connecting the station reference ground - see page 4-1
Connecting transformer taps/load wiring - see page 3-1
Installing control/monitor wiring - see page 8-1
Commissioning tasks - see page 9-1
Perform operational tasks:
, beginning on
Connecting ac power - see page 5-1
Содержание NX100
Страница 1: ...NX100 Transmitter Installation Manual Document NHB NX100 INS Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Installation Manual Page viii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Installation Manual Connecting transformer taps load wiring Page 3 6 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Installation Manual Adjusting the spark gap Page 6 4 Issue 3 2 2017 03 31...
Страница 38: ...NX100 Installation Manual Installing audio inputs Page 7 6 Issue 3 2 2017 03 31...
Страница 52: ...NX100 Installation Manual Parts and tools Page 10 4 Issue 3 2 2017 03 31...
Страница 62: ...NX100 Installation Manual Pre installation Installation assistance Page 11 10 Issue 3 2 2017 03 31...
Страница 65: ......