
NX100 Installation Manual
Unpacking and positioning
Page 2-4
Issue 3.2 2017-03-31
12. Locate the cable tray parts kit that was provided to support the cables that will connect ac
power between the ac power disconnect switch and the primary for the power transformer,
and also between the secondary of the power transformer and the transmitter cabinets.
These parts may have been provided by Nautel (Cable Tray Parts List # 207-8385-**) or
purchased from an alternate vendor. Install the cable tray system according to your
transmitter system dimensions. If the cable tray kit was purchased from Nautel, refer to
Section 5 - Electrical Requirements of the
NX100 Pre-installation Manual
for standard
drawings and parts lists or to the provided system manual for custom drawings and parts lists
- to aid in the installation.
11. Obtain four stiffener brackets [Nautel Part # 207-8296 (qty 1), 207-8296-01 (qty 1) and
207-8296-02 (qty 2)] for each transmitter cabinet from the ancillary kit. Install them on the
top of each cabinet as shown in
. Use the existing hardware that
secures the exhaust duct's grill to secure the stiffener brackets. These brackets provide
additional mechanical strength to the top of the cabinet(s).
Содержание NX100
Страница 1: ...NX100 Transmitter Installation Manual Document NHB NX100 INS Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Installation Manual Page viii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Installation Manual Connecting transformer taps load wiring Page 3 6 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Installation Manual Adjusting the spark gap Page 6 4 Issue 3 2 2017 03 31...
Страница 38: ...NX100 Installation Manual Installing audio inputs Page 7 6 Issue 3 2 2017 03 31...
Страница 52: ...NX100 Installation Manual Parts and tools Page 10 4 Issue 3 2 2017 03 31...
Страница 62: ...NX100 Installation Manual Pre installation Installation assistance Page 11 10 Issue 3 2 2017 03 31...
Страница 65: ......