![National 5200 PANTHER Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/national/5200-panther/5200-panther_instruction-manual_3371721052.webp)
Page 39
5200 & 5200QL MACHINE MAINTENANCE
HOSE CHANGE OUT
To Remove Or Change A Hose
1. Disconnect machine from power.
2. Remove hood.
3. Using proper wrench size, remove hose from fitting.
4. When replacing, make sure O-ring is properly seated on hose fitting.
FOOT PEG
To Remove Or Replace Foot Peg
1. Insert a socket wrench into foot peg and secure bolt head.
2. Remove nut and washer.
3. Remove bolt and foot peg.
4. Replace foot peg before operating machine. DO NOT use machine without foot pegs.
PUMP CHANGE OUT
1. Remove doghouse to expose pump.
2. Disconnect hydraulic lines.
3. Remove two 5/16" pump securing bolts.
4. Remove pump by pulling pump straight out from pump motor.
VALVE CHANGE OUT
1. Disconnect machine from power (charger or battery).
2. Lift hood and secure in place.
3. Remove hoses from valve body. have a container ready to catch leakage from lines.
4. Take notice of angle of valve fittings.
5. Remove two ¼" bolts securing valve body.
MOTOR CHANGE OUT
1. Disconnect motor from power.
2. Lift hood and secure in place.
3. Remove pump (see pump change out).
4. Loosen the bracket holding the motor.
5. Remove motor.
Содержание 5200 PANTHER
Страница 91: ...Page 66 5200 5200QL MATERIAL SAFETY DATA...
Страница 92: ...Page 67 5200 5200QL MATERIAL SAFETY DATA...
Страница 93: ...Page 68 5200 5200QL MATERIAL SAFETY DATA...
Страница 94: ...Page 69 5200 5200QL MATERIAL SAFETY DATA...
Страница 95: ...Page 70 5200 5200QL MATERIAL SAFETY DATA...
Страница 96: ...Page 71 5200 5200QL MATERIAL SAFETY DATA...