Figure 2.
Chassis Preparation
SCXI
120V
ac
~
4
RESET
ADDRESS
ON
5
4
3
2
1
Front
Back
5
4
3
2
1
PO
WE
R
RESET
ADDRESS
ON
1
2
3
1. Chassis Power Switch
2. Chassis Address Switches
3. Chassis Power Settings
4. Power Cord Connector
1. Power off and unplug the chassis.
2. Install the switch controller, including any adapter kit(s), as described in the switch
controller documentation.
Note
Ensure the chassis is still powered off before continuing to install your
switch module.
3. Set the chassis address switches to the OFF position. If you are using multiple SCXI
chassis, ensure each chassis has a unique binary address.
Note
Earlier chassis use jumpers inside the chassis front panel instead of
chassis address switches. Earlier chassis also differ in fuses and AC power
selection. Refer to the documentation specific to your chassis for more
information.
4. Confirm the correct power settings of the chassis (100, 120, 220, or 240 VAC).
5. Remove the filler panel from an unused SCXI slot.
6. Touch any metal part of the chassis to discharge static electricity.
7. Insert the switch module into the SCXI slot.
8. Screw the switch front panel to the chassis front panel mounting rail.
8 |
NI Switches Getting Started Guide
| ni.com
Содержание SCXI-1194
Страница 1: ...SCXI 1194...