Contents
III
Contents
Safety considerations and instructions ....….…………..
EC Declaration of Conformity PMM L3-32 and L3-64 ….
EC Declaration of Conformity PMM L3-64/690 ………….
EC Declaration of Conformity PMM L3-100 …………….
EC Declaration of Conformity PMM L1-500 and L3-500
EC Declaration of Conformity PMM SBRF4 ....................
1 General Information
1.1 Documentation..................................……....................
1.2 Introduction to PMM Artificial Mains Network………...
1.3 PMM Artificial Mains Networks for “CURRENT
INJECTION” test………………………………………….
1.4 Shipping components..........….....................…………..
1.5 Optional accessories……………………………………..
1.6 Environment....……................................................…..
1.7 Return for service.........................................................
1.8 Equipment cleaning......................................................
2 PMM L3-32
2.1 Main specifications.......................................................
2.2 Front and Rear panels............................................…..
3 PMM L3-64 and L3-64/690
3.1 L3-64 Main specifications ............................................
3.2 L3-64/690 Main specifications ………………………….
3.3 Front and Rear panels..................................................
4 PMM L3-100
4.1 Main specifications.......................................................
4.2 Front and Rear panels............................................…..
5 PMM L3-500
5.1 Main specifications.......................................................
5.2 Front and Rear panels................................……………
6 Installation
6.1 Introduction...................................................................
6.2 Initial inspection............................................................
6.3 Packing unpacking.......................................................
6.4 Preparation for use...................................................…
6.5 Pilot Circuit..............................................................…..
6.6 Installation check list....................................................
7 Operating PMM Artificial Mains Networks
7.1 Operating PMM Networks............................................
7.2 Test Set-Up Considerations.…………………...............
7.3 Network verification and maintenance.….....................
7.4 Remote receiver control connector………………..……
7.5 LISN remote cable Configuration for PMM 9010F…...
7.6 LISN remote cable Configuration for PMM 8010……...
Page
V
VII
VIII
VIII
IX
X
Page
1-1
1-1
1-2
1-3
1-3
1-3
1-4
1-4
Page
2-1
2-2
Page
3-1
3-2
3-3
Page
4-1
4-2
Page
5-1
5-2
Page
6-1
6-1
6-1
6-2
6-2
6-3
Page
7-1
7-2
7-3
7-4
7-5
7-6
8 Accessories
8.1 PMM SBRF4 RF Switching Box (optional)....................
Page
8-1
Содержание PMM L3-32
Страница 20: ...3 4 PMM L3 64 This page has been left blank intentionally...
Страница 28: ...5 6 PMM L3 500 L1 500 same as each L3 500 line equivalent circuit...
Страница 32: ...6 4 Installation This page has been left blank intentionally...
Страница 46: ...Suggerimenti Commenti Note Suggestions Comments Note...