background image

 

 

 

NARDA 
Safety 
Test 
Solutions 

S.r.l. Socio Unico

 

Sales & Support: 

Via Rimini, 22 
20142 - Milano (MI)

 

Tel.: +39 02 581881  
Fax: +39 02 58188273 

Manufacturing Plant: 

Via Benessea, 29/B 

17035 - Cisano sul Neva (SV) 

Tel.: +39 0182 58641 
Fax: +39 0182 586400 

  

 

               http://www.narda-sts.it

 

 

 

 

 

SERIAL NUMBER OF THE INSTRUMENT 

You can find the Serial Number on the rear panel of the instrument. 
Serial Number is in the form: 0000X00000. 
The first four digits and the letter are the Serial Number prefix, the last five digits are 
the Serial Number suffix. The prefix is the same for identical instruments, it changes 
only when a configuration change is made to the instrument. 
The suffix is different for each instrument.

 

 
Document L3EN-10423 – Copyright © NARDA 2021 

 

 

 

 

 

 

User’s Manual 

 

PMM L3-32 
PMM L3-64 

PMM L3-64/690 

PMM L3-100 
PMM L1-500 
PMM L3-500

 

ARTIFICIAL MAINS NETWORKS 

 

PMM SBRF4 

RF SWITCHING BOX 

Содержание PMM L3-32

Страница 1: ...ar panel of the instrument Serial Number is in the form 0000X00000 The first four digits and the letter are the Serial Number prefix the last five digits are the Serial Number suffix The prefix is the...

Страница 2: ...n a high quality instrument that will give you many years of reliable service Nevertheless even this product will eventually become obsolete When that time comes please remember that electronic equipm...

Страница 3: ...tions 3 2 L3 64 690 Main specifications 3 3 Front and Rear panels 4 PMM L3 100 4 1 Main specifications 4 2 Front and Rear panels 5 PMM L3 500 5 1 Main specifications 5 2 Front and Rear panels 6 Instal...

Страница 4: ...t set up Remote Control connector Front view LISN remote cable configuration for PMM 9010F LISN remote cable configuration for PMM 8010 PMM SBRF4 RF Switching Box PMM SBRF4 Front view PMM SBRF4 Right...

Страница 5: ...of mains protection the power line must be equipped with adequate protection commensurate to the consumption of all the devices connected to it In case of connection of the device to the power mains...

Страница 6: ...rs can reach dangerous levels when using the apparatus at high currents All power cords must be connected to ensure proper ventilation and control of the contactors Where Front and Back EUT LINE IN an...

Страница 7: ...e EMC 2014 30 EU and of the RoHS directive 2011 65 EU Cisano sul Neva 24 08 2016 Egon Stocca General Manager EC Declaration of Conformity In accordance with the Decision 768 2008 EC Compliant to the D...

Страница 8: ...ive EMC 2014 30 EU and of the RoHS directive 2011 65 EU Cisano sul Neva 24 08 2016 Egon Stocca General Manager EC Declaration of Conformity In accordance with the Decision 768 2008 EC Compliant to the...

Страница 9: ...e EMC 2014 30 EU and of the RoHS directive 2011 65 EU Cisano sul Neva 24 08 2016 Egon Stocca General Manager EC Declaration of Conformity In accordance with the Decision 768 2008 EC Compliant to the D...

Страница 10: ...isano sul Neva SV ITALY based on the following harmonized European Standards successfully applied Safety EN 61010 1 undated reference applies to all editions EMC EN 61326 1 undated reference applies t...

Страница 11: ...hm 50 H fully compliant with CISPR publ 16 VDE 0876 and FCC part 15 regulation The LISNs are suited to perform measurements on conducted interference in the frequency range from 9 kHz to 30 MHz Design...

Страница 12: ...n to conducted EMC immunity in the range 10 kHz 30 MHz by injecting on the supply lines certain RF interference and checking the DUT s response PMM LISNs may be used also to this purpose by injecting...

Страница 13: ...BNC 50 Ohm Load Certificate of Compliance Contactors connectors Return for Repair Form 1 5 Optional Accessories PMM LISN Network can be used with PMM SBRF4 RF Switching Box LISN Service Kit AC BNC ada...

Страница 14: ...pment is preferable In case other package should be used ensure to wrap the instrument in heavy paper or plastic Use a strong shipping container and use enough shock absorbing material around all side...

Страница 15: ...ed output current Maximum operating voltage Single phase L N L PE N PE Three phase L PE N PE L L L N Input Mains frequency range Equivalent circuit RF output Test item Rated temperature Storage temper...

Страница 16: ...nd contact 2 Mains supply to DUT 32A 3 Manual switch for phase under test With PMM receivers the switch is disabled and the switching is automatic 4 RF output to EMI Signal Analyzer 50 ohm BNC female...

Страница 17: ...specifications PMM L3 64 Frequency range Maximum rated output current Maximum operating voltage L PE N PE L L L N Input mains frequency range Equivalent circuit RF output Test item Rated temperature...

Страница 18: ...input current Maximum operating voltage L PE N PE L L L N EUT main power supply Input mains frequency range Equivalent circuit RF output Rated temperature Storage temperature Overall dimension mm W x...

Страница 19: ...nt Panel Fig 3 2 Rear Panel Legend 1 Ground contact 2 Mains supply to DUT 3 Manual switch for phase under test With PMM receivers the switch is disabled and the switching is automatic 4 RF output to E...

Страница 20: ...3 4 PMM L3 64 This page has been left blank intentionally...

Страница 21: ...t current Overload current Maximum operating voltage L PE N PE L L L N AC supply frequency range Equivalent circuit RF output Test item Rated temperature Storage temperature Overall dimension mm W x H...

Страница 22: ...nt Panel Fig 4 2 Rear Panel Legend 1 Ground contact 2 Mains supply to DUT 3 Manual switch for phase under test With PMM receiver the switch is disabled and the switching is automatic 4 RF output to EM...

Страница 23: ...d the assembly of 4 of it results in a L3 500 LISN 3L N Table 5 1 lists the PMM L3 500 Network performance specifications Please read carefully and always follow all safety requirements especially the...

Страница 24: ...tors Rated temperature Storage temperature Overall dimension mm W x H x D Weight 9 kHz to 30 MHz 500 A 20 minutes starting the test at max 25 C LISN internal temperature 300 A continuous 400 Vac 565 V...

Страница 25: ...rom left to right 1 POWER on led 2 FAN on led 3 OVERHEATING led 4 FAN 5 CAUTION VOLTAGE PRESENT led 6 OUTPUT Connector To Test Receiver 50 7 Mains LINE OUT To EUT with Protective Earth 8 CHOKE BYPASS...

Страница 26: ...wer the Device Under Test with the 250 H series internal Choke standard Short circuited pins for Mains power enabling open circuit when no 230V Services Supply present or when overheating fault occurs...

Страница 27: ...M L3 500 5 5 To maximize the protection the four rear ground connectors must be electrically connected to each other via cables like depicted on the right Fig 5 4 Four rear ground connectors connectio...

Страница 28: ...5 6 PMM L3 500 L1 500 same as each L3 500 line equivalent circuit...

Страница 29: ...checked for completeness and the instrument has been checked mechanically and electrically Verify the accessories availability in the shipping container referring to the accessories check list enclose...

Страница 30: ...ed with an auxiliary connector called Pilot Circuit contact The Pilot Circuit contact is used to avoid mains plug disconnection with an operating high current load connected In this case a current rat...

Страница 31: ...re that cables and terminals used to connect PMM LISN Network to supply line and to Equipment Under Test are suitable for the setup current rating and proper safety insulation Verify that 50 ohm RF ca...

Страница 32: ...6 4 Installation This page has been left blank intentionally...

Страница 33: ...front panel in this case there is no led indication Using PMM receivers the phase switching can be automatically performed in this case the phase under test will be indicated by the led in the front p...

Страница 34: ...es VDE 0877 exactly define the dimensions for the test configurations by means of the following drawing Fig 7 1 Typical test set up The figure 7 1 describes the test configuration and the interconnect...

Страница 35: ...hall be working at 1 MHz Verification test procedure 1 Connect the RF signal or tracking signal to the mains output of L3 100 making sure that the ground is connected to the shield of the RF cable gro...

Страница 36: ...Remote receiver control connector The Remote receiver control connector is on the rear panel Fig 7 2 Remote Control connector Front view Legend 1 GND 2 12V 6 TTL1 7 TTL2 TTL1 TTL2 LINE 0 0 N 0 1 L2 1...

Страница 37: ...works 7 5 7 5 LISN remote cable Configuration for PMM 9010F The following figure shows the LISN remote cable pin configuration The cable is provided with the LISNs Fig 7 3 LISN remote cable configurat...

Страница 38: ...able pin configuration The cable can be requested to Narda or you can make it by yourself The PMM 8010 is no longer supported Please check the manufacturing status of the Narda products from the websi...

Страница 39: ...ave multiple outputs up to 4 like the PMM L3 500 LISN model or multiple L1 150s LLAs and also LISNs antennas and transducers by other manufactures to any receiver that has one input only The SBRF4 all...

Страница 40: ...control connector for PMM EMI Receivers Functions Manual or automatic switch for phase axis under test Remote control from PMM EMI Receivers Band switch Selectable 50 termination Selectable 150 kHz H...

Страница 41: ...RF input for lines axis under test Front view Fig 8 2 Front view A Selectable open or 50 termination unselected inputs B Filter 150kHz 108MHz C Manual switch for phase axis under test with PMM receive...

Страница 42: ...ox can operate in combination with external Artificial Mains Network or Large Loop Antenna Some examples of connections are illustrated in the following figures Fig 8 5 PMM SBRF4 with external Artific...

Страница 43: ...RF input s Connect the SBRF4 RF output to the PMM 9010F or 9010 30P Receiver RF input use the manual switch for switching the LISNs Connect the Remote control connector of the SBRF4 and the User Port...

Страница 44: ...in the order X Y Z Connect the RF output of the SBRF4 to the RF input of the PMM 9010F or 9010 30P Receiver use the manual switch for switching the axis under test Connect the Remote control connector...

Страница 45: ...like to submit to the attention of our service organization is kept in great consideration Moreover we are continuously improving our quality but we know this is a never ending process We would be gl...

Страница 46: ...Suggerimenti Commenti Note Suggestions Comments Note...

Отзывы: