EN
W415-2899 / A / 10.07.20
23
installation
4.1 exterior finish material - between 1” (25mm) and 2” (51mm) (all)
1.0 Place the standoff in the framed
opening, using the tabs as guides.
2.0 Secure the standoff to the sheathing
using the 8 long screws (supplied
in standoff kit). The screws should
penetrate through the sheathing and
into the wall framing.
Silicone
3.0 Attach the termination to the venting,
see “pre-installation” and “venting”
sections.
Silicone
note:
Diagrams are for illustrative purposes
only. Installation must comply with all
local codes.
Refer to “venting requirements” and “venting installation” sections in
your appliance installation manual.
Terminal
X 4
• Terminal (ST47U)
• Standoff (SOST47)
Required for 4”7”:
• Terminal (ST58U-1)
• Standoff (SOST58)
Required for 5”/8”:
note:
All inner flex pipe and outer flex pipe
joints to the termination may be sealed
using high temperature red RTV silicone
W573-0002 (not supplied) or the high
temperature sealant W573-0007 Mill
Pac (not supplied). However, the high
temperature sealant W573-0007 Mill
Pac (not supplied) must be used on the
joint connecting the inner flex pipe and
the exhaust flue collar of the appliance.
4.0 Install the termination and venting
from the outside of the building,
bringing the venting through the
opening in the wall.
5.0 Slide the terminal return flange over
the standoff and secure with 4 short
screws (supplied in standoff kit).
6.0 Apply a bead of clear silicone to seal
the edges of the termination.
7.0 Apply the exterior finish material
around the standoff and termination,
sealing between the termination and
exterior finish material (1” [25mm] - 2”
[51mm]) with silicone.
X 8
Standoff