W415-2184 / 06.07.19
EN
24
framing
HEADE
R
Enclosure height
39 1/8" (99.4cm)
min.
(REAR VENT)
/
53 1/8" (134.9cm)
min.
(TOP VENT)
22 1/4"
(56.5cm)
13 1/4"
(33.7cm)
34 3/8"
(87.3cm)
Before framing your appliance, determine vent requirements before deciding the final location of the appliance.
After rough framing, place the appliance in its final position.
For heavier finishing materials such as marble, we recommend adding extra support to the frame. Ensure
there is adequate floor support for the appliance and finishing material.
note: