general information
1.3 installation
overview
Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Determine fi nished fl oor thickness (see “rough framing” section).
3. Plan out appliance enclosure, framing, fronts, accessories, etc.
4. Install rough framing (refer to “rough framing” section).
5. Install nailing tabs and header shield (refer to “header shield installation” sections).
6. Place the appliance in its fi nal position.
7. Install appliance venting (refer to “venting installation” section).
8. Install all electrical wirings (refer to “electrical information” section).
9. Install gas lines (refer to “gas installation” section).
10. Test appliance.
11. Complete framing (refer to “fi nish framing - typical”
or
“fi nish framing - recess” sections).
12. Finishing (refer to “fi nishing” section).
13. Complete checklist in the owner’s manual and apply serial number to owner’s manual.
10
Non-combustible
board
5
9
6
3
4
2
1
7
For Dynamic Heat Control™ installation steps, refer to the leafl et provided with the Dynamic Heat Control™ kit.
Start Dynamic Heat Control™ installation before step 3 (place the appliance in its fi nal position)
note: