W415-1239 / A / 03.21.14
31
IOM
IMPORTANT:
CONNECT
1/2
” TEE FITTING (FIELD SUPPLIED)
TO THE OUTLET OF THE CONDENSATE TRAP
(FIGURE 15).
FIGURE 15
FIGURE 16 - UPFLOW VENT AND DRAINING OPTION
LEFT VENT INSTALLATION
TOP VENT INSTALLATION
NOTE
Trap can be installed on the left or right side of the unit.
Only left side install pictured.
IMPORTANT:
• PRIME CONDENSATE TRAP WITH WATER AND CUT DRAIN HOSES TO PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING TO PROPER LENGTH.
H3.16
THERE MUST NOT BE ANY OPENINGS BETWEEN THE BLOWER DIVISION PANEL AND
THE COMBUSTION COMPARTMENT. THE BLOWER COMPARTMENT IS UNDER GREATER
SUCTION THEN THE COMBUSTION COMPARTMENT AND CAN PULL COMBUSTION
AIR FROM THE BURNERS AND CAUSE INCOMPLETE COMBUSTION AND ERRATIC
FURNACE OPERATION.
WARNING
!
!
Содержание 9500-B Series
Страница 27: ...W415 1239 A 03 21 14 27 IOM FIGURE 14A DIRECT VENT TERMINAL CLEARANCES...
Страница 28: ...W415 1239 A 03 21 14 28 IOM IOM FIGURE 14B NON DIRECT VENT TERMINAL CLEARANCES...
Страница 57: ...W415 1239 A 03 21 14 57 IOM 23 0 SERVICE HISTORY 43 1...
Страница 58: ...W415 1239 A 03 21 14 58 IOM IOM 24 0 NOTES 44 1...
Страница 74: ...6 0 NOTES 44 1 W415 1239 A 03 21 14 UM 74...
Страница 75: ...44 1 W415 1239 A 03 21 14 UM 75...