Chapter 3
Performing a Surface Vault Installation
Trillium Compact User Guide
16889R5
2014-03-04
16
installing model number TC120-PH1 or TC20-PH1 as a surface vault seismometer, you will
also need the optional levelling bubble (Nanometrics part number MSC0225) and the
adjustable levelling feet kit (Nanometrics part number 17245). See
4 for a description of these items. See also
“Insulating with a Rigid Foam Box”
23 for another method of insulating the
seismometer.
To perform this type of deployment,
1. Plug the cable into the seismometer.
Section 3.5 “Best Practices for Alignment and Levelling”
19 to properly
align and level the seismometer.
3. Place the insulating cover over the seismometer, fitting the cable exit slot over the
cable. For more detailed instructions, see
Section 3.8 “Installing a Trillium Compact in
4. Power the seismometer, and using a digitizer (see
) or the Trillium Compact Web interface (see
), verify a level installation
by checking that the mass positions are within an acceptable range (at or very close
to zero).
3.3.2 Temporary Installations on Rock
Installations on rock are at the surface level and the seismometer must be in a sealed,
insulated enclosure to protect it from the elements or other environmental disturbances. To
achieve optimal levelness and insulation, the following optional equipment is
recommended: a levelling cradle (Nanometrics part number 16863) and a Carrying Case
/ Insulating Cover (Nanometrics part number 16862). In addition, if you are installing model
number TC120-PH1 or TC20-PH1 as a surface vault seismometer, you will also need the
optional levelling bubble (Nanometrics part number MSC0225). See
4 for descriptions of these items. See also
“Best Practices for Alignment and Levelling”
Section 3.7.2 “Insulating with
23 for other methods of levelling and insulating the
seismometer.
To perform this type of deployment,
1. Locate the flattest available surface for your installation.
2. Plug the cable into the seismometer and secure it to the side of the unit with a tie
wrap.
3. Remove the feet from the seismometer and retain for future deployments.
Section 3.5 “Best Practices for Alignment and Levelling”
Section C.1 “Using the Levelling Cradle”
74 to properly align and level the
seismometer in the levelling cradle.
5. Lay sand in a ring around the levelling cradle to create a flat and level sealing surface
for the insulating cover.