Installation Procedure 

 

Only Qualified personnel should make electrical and mechanical connections.  
 

Foundation:  

Dryer should be mounted on a suitably structured flat and level floor 

or base that is free from vibration. Special care must be used when 

lifting the dryer to prevent tip-over 

 
Mounting:

 

Bolt dryer to the foundation using the boltholes provided in the frame. 

 

Piping:  

Connect the inlet of the dryer to the moist gas from the 
compressor/receiver/inlet filter. Install the inlet piping and the inlet 

shutoff valve. Install the Outlet piping and the outlet shutoff valve (a 

union with a valve by-pass can be installed at the inlet and outlet 
valves to accommodate isolation of the dryer for maintenance). 

Compressed air piping has to be at least the same size as that of the inlet 
and outlet connections of the dryer. Larger pipe sizes can be used with 

reducers.  

 

Back Pressure regulators:  

Install backpressure regulator to prevent any possibility of fluidization of the 
desiccant bed. When there is a sudden increase in the demand for 

compressed air downstream of the dryer, a huge pressure drop develops and 
can affect the performance of the life of the dryer and the drying material 

(desiccant).  

 

Desiccant:  

Make sure that the dryer towers are filled with desiccant. Larger dryers may 
have desiccant shipped separately 

 in which case, the media has to be filled 

into the pressure vessels from the desiccant fill ports. Care must be taken 
when filling the media and it must be done gradually to prevent powdering.  

 

Muffler:  

In the event that mufflers have been shipped loose, they must be installed 

and secured 

 

By-pass: 

If the dryer is not supplied with optional block and by-pass valve system it is 

highly  recommended  that  a  block  and  by-pass  valve  system  be  installed 
around the dryer and filters. This block and by-pass valve system will permit 

the  dryer  and  filters  to  be  removed  from  the  compressed  air  system  for 

servicing without shutting down the entire compressed air system. Ensure that 
the bypass valves are rated for more than 250 Deg. F. 

Содержание NBP Series

Страница 1: ...nano pg 1 OPERATION MANUAL NBP SERIES EXTERNALLY HEATED BLOWER PURGE nano purification solutions 5509 David Cox Road Charlotte NC 28269 Tel 704 897 2182 Fax 704 897 2183 Web www n psi com...

Страница 2: ...sponding drawings We strongly suggest that all personnel involved with the machine read the entire contents of the manual before proceeding with the installation or maintenance activities Dryer Type H...

Страница 3: ...risk of electric shock and only authorized personnel with proper gear must approach it High Noise Area All personnel are required to wear ear protectors before approaching the vicinity of the equipmen...

Страница 4: ...ed with the installation operation and maintenance of the equipment 6 Before performing any maintenance operations on the equipment the unit must be halted and completely depressurized 7 To ensure com...

Страница 5: ...ut down put up warning notice to prevent the unit from being switched ON accidentally 6 Inspect all piping hoses and connections Make sure that all hoses are in good condition and are rated for the co...

Страница 6: ...ernal shipping damage 1 Make sure you have received all the crates packages that are indicated in the packing slip 2 Remove the crate and packaging 3 Inspect the unit for any internal damages If you n...

Страница 7: ...e therefore lasting much longer Products that may come in contact with clean dry compressed air is virtually unaffected hence rejection rates are reduced nano regenerative desiccant air dryers dry com...

Страница 8: ...ASME code Desiccant fill and drain ports for ease of desiccant replacement Structural steel frame complete with floor stand Reliable non lubricated air inlet valves equipped with standard position ind...

Страница 9: ...g regenerated This hot low pressure ambient air is passed into the chamber being reactivated in a direction counter to drying circuit As it passes through the desiccant the hot air adsorbs all the moi...

Страница 10: ...es 240 Regeneration Time in minutes 230 Re pressurization Time in minutes 10 Inlet and Outlet Size in Inches 6 FLG Purge line Connection 6 FLG Desiccant Type of Desiccant F 200 316 Size of Desiccant i...

Страница 11: ...nano pg 11...

Страница 12: ...r lifted by the attached piping Location Careful consideration should be given to the location of the dryer in order to assure optimum results Ensure that the load bearing weight of the floor is adequ...

Страница 13: ...lator to prevent any possibility of fluidization of the desiccant bed When there is a sudden increase in the demand for compressed air downstream of the dryer a huge pressure drop develops and can aff...

Страница 14: ...t an arrangement for removing trapped condensate Make sure that you do not apply any back pressure on this exhaust system Note It is mandatory that dryer be grounded Use of your plants frame as a grou...

Страница 15: ...AND BYPASS VALVES MAKE CERTAIN THE OUTLET BLOCK VALVE IS CLOSED AND THE BYPASS VALVE IS OPEN THE INLET BLOCK VALVE SHOULD BE OPEN ALWAYS OPEN VALVES SLOWLY 6 SLOWLY PRESSURIZE THE DRYER VESSELS TO OPE...

Страница 16: ...NUMBERS 13 HEATER TEMPERATURE CONTROLS ARE ALL FACTORY SET AND NOT ADJUSTABLE 14 THE DRYER CYCLE TIME IS 4 HOURS DRYING 3 HOURS HEATING 50 MINUTES COOLING 10 MINUTES REPRESSURIZATION Shut down proced...

Страница 17: ...flow Maintenance Prior to performing any maintenance on the dryer all personnel are strongly advised to familiarize themselves with the equipment by reading the entire contents of this operation manu...

Страница 18: ...s Knock out excess particulate and back flow with dry compressed air If particulate cannot be removed completely change the exhaust mufflers 4 Check desiccant condition Powder in the mufflers is an in...

Страница 19: ...e if there is power at all the electrical connections in the machine and if it s the required amount 5 Check if control air is available for all pneumatically operated components 6 Make sure all shut...

Страница 20: ...inlet flow velocities due to high flow Dryer fails to switch towers Inlet valve not operating Check for pilot air signal No input power Check to assure that dryer is being on with correct voltage Exha...

Страница 21: ...eplace with larger pipe if required Check valve leakage Clean repair or replace Note To test outlet check valves by pass and depressurize dryer shut off purge adjustment valve pressurize outlet to the...

Страница 22: ...er obligations on the part of nano Warranty claims must be submitted and shall be processed in accordance with nano s established warranty claim procedure In no event will nano be liable for business...

Страница 23: ...______________________________________ ADDRESS ____________________________________________ CITY ________________________ STATE ________________ ZIP ________________ TELEPHONE _____________________ FA...

Страница 24: ...pg 24...

Отзывы: