8
If individual power cells are to be
installed in place of the batons,
they can be placed a piece at a
time following the same instruction
above, with careful attention paid to
aligning all power cells within a
layer to orient toward the same
direction.
All power cells in the bottom half of
the battery compartment should
have the posit-ive end of all cells
facing the right side of the PL-P,
when viewed from the front. Place
the second layer of power cells in
the top half of the battery
compartment, with the positive end
of all cells facing the left side of the
PL-P, when viewed from the front.
Rechargeable battery batons
supplied from the factory must
be fully charged in the PL-P
before use. See next section for
full instructions.
Connecting the PLP-CCC3 AC Power Supply
Once the batteries are properly
installed in the PL-P, the male
Lemo connector of the PLP-CCC3
AC power supply unit can be
connected to the female input
socket, marked “Power Pack”, on
the right side panel of the PL-P.
The Lemo connector has a red dot
that should be oriented to face
upwards when inserting the
connector into the socket. Fully
seat the connector in the socket.
With the Lemo connector inserted,
connect the IEC-specification
power cord to the PLP-CCC3 AC
power supply unit and to an
approved AC power outlet. The
proper operating range of the PLP-
CCC3 AC power supply unit is as
follows:
• Input Voltage
94-264 V, AC
• Frequency
50-60 Hz
Photograph showing the correct way to connect the PLP-
CCC3 charger