background image

 

15

 

Installation and operation manual

DTHR-V9-2020 

 

 

 
 

Warning 

All  electrical  connections  must  be  performed  by  a  qualified  electrician  in  accordance  with  the 
electrical diagram provided with the unit following applicable local laws and regulations. Also refer to 
Electrical  codes  CSA  C22.1  for  Canada  and  ANSI/NFPA  #70  for  the  United  States.  The  operating 
sequence  described  by  the  wiring  diagrams  or  in  the  PLC  should  never  be  changed  without  the 
approval of the manufacturer.  

 

Always use copper wire with the proper size suited for the application.  

The unit is already pre-wired at factory. Refer to the wiring diagram for remaining wiring connections: 

 

Main 120V/60Hz/1ph ac power supply (see wiring diagram for current); 

 

On/Off contact for heating demand. This heating demand must be wired in series with at 
least one of the following but not limited to; a motor contactor auxiliary switch, an air 
proving switch or another air flow device. Do not cycle this contact. 

 

2-10 VDC modulation signal. 

 

Component minimum operating temperature requirement 

 

 

Warning 

Every component requires a minimum ambient temperature during operation. If you don’t order 

the 

Nagas 

heating and control cabinet solution you must build your own. Also, every component 

must be protected from environmental elements and covered because of high voltage hazard. 

 

Minimum operation temperature 

Zone A 

Zone B 

Zone C 

0

o

C (32

o

F) 

-20

o

C (-4

o

F) 

-40

o

C (-40

o

F) 

Components 

 

Electrical controls 

 

Содержание DTHR Series

Страница 1: ...DTHR V9 2020 21 DTHR Series For installation inside an OEM air handler INSTALLATION AND OPERATION MANUAL 1385 Lionel Boulet blvd Varennes Quebec Canada J3X1P7...

Страница 2: ...cause serious injury death or property damages Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS o Do not t...

Страница 3: ...ay HMI features 30 Run window 31 Level 1 Air Gas relation 32 Level 1 Alarm history 33 Level 2 Fan RPM auto tuning 34 Level 2 Signal supervision 35 Level 2 Step timer 36 PLC alarms 37 Flame safeguard a...

Страница 4: ...nt Install the unit on a non combustible floor Allocate enough space around the unit for maintenance and around the combustion air intake and the inlet air hood to prevent harmful accumulation of snow...

Страница 5: ...c a high pressure regulator must be installed at gas piping inlet The regulator must be suitable for modulation ratio of 40 1 to properly regulate gas pressure at low fire The regulator vent must be p...

Страница 6: ...c kPa At maximum capacity In w c kPa In w c kPa MBH Kw 35 7 1 74 10 2 5 2 3 0 57 3 5 0 87 30 8 79 40 2 9 0 72 50 4 6 1 15 55 3 1 0 77 40 11 7 65 2 8 0 69 75 2 3 0 57 85 2 9 0 72 100 3 8 0 95 125 2 6...

Страница 7: ...n manual DTHR V9 2020 See installation dimensions section for more details Unit dimensions Note The controls shown are on the left hand side of the unit for a right hand unit the drawing is mirrored a...

Страница 8: ...21 2 26 26 Weight Lbs 380 383 423 475 476 560 582 652 647 726 Weight with options 451 454 503 566 564 670 692 762 773 852 Dim Metric mm A 1194 1194 1194 1334 1334 1422 1473 1549 1721 1721 B 1016 1016...

Страница 9: ...ng on the model the flue vent connection diameter ranges from 6 to 10 inch The DTHR models are designed to operate effectively and safely with a positive stack category III type sealed single wall or...

Страница 10: ...sibility to test for safety and functionality Horizontal discharge Step 1 Install the unit on an insulated floor Step 2 Install walls on each side see dimension table The walls must be in contact with...

Страница 11: ...imension table The walls must be in contact with the guides on the support structure The walls must be insulated with 2 of high temperature insulation Step 3 Install the air baffle on the internal sid...

Страница 12: ...is essential for the proper operation of the unit Improper positioning of the supply temperature sensor could result in high temperatures in the supply ducts a thermal protection shutdown the closing...

Страница 13: ...en facing air stream Installation dimensions WARNING Improper installation adjustment alteration can cause serious injury death or property damages Note The controls shown are on the left hand side of...

Страница 14: ...THR V9 2020 DTHR Vertical discharge Left hand control when facing air stream Note The controls shown are on the left hand side of the unit for a right hand unit the drawing is mirrored and dimensions...

Страница 15: ...2 54 1 2 54 1 2 60 60 60 75 1 2 S 45 45 45 45 51 51 56 1 2 56 1 2 56 1 2 72 U 10 11 1 2 14 1 2 16 17 19 1 2 20 23 29 28 V 13 7 8 13 1 8 11 5 8 13 3 8 12 7 8 11 5 8 11 3 8 9 7 8 9 1 2 10 Dim Metric mm...

Страница 16: ...for remaining wiring connections Main 120V 60Hz 1ph ac power supply see wiring diagram for current On Off contact for heating demand This heating demand must be wired in series with at least one of th...

Страница 17: ...h screen interface 2 Programmable logic controller PLC 3 Heating element 4 Input Output expansion module I O 5 Ignition transformer 6 High limit protection set at 160oF 7 Flame safeguard module 8 Ther...

Страница 18: ...off valve 1 7 Valve proving system with IRI option 8 Main gas safety shutoff valve 2 9 Modulating gas valve actuator 10 Modulating gas valve 11 Low fire orifice bypass 12 Test firing gas valve 13 High...

Страница 19: ...standards 1 2m 4 to the side U S A standards Vent outlet from another service 0 9m 3 Building or adjacent wall or parapet 1 8m 6 might have to be increased for horizontal discharge Sidewalk or parkin...

Страница 20: ...s these units can produce condensate This corrosive liquid must be treated and drain correctly with provision to prevent freezing It is very important not to orient the vent outlet towards a fresh air...

Страница 21: ...20 Installation and operation manual DTHR V9 2020 Recommended roof top Flue Vent Exhaust and or Combustion Air Duct Recommended wall horizontal Flue Vent Exhaust and Combustion Air Duct Concentric kit...

Страница 22: ...of straight sections of the flue vent to the equivalent length of all the elbow pipes used A 90 degree elbow pipes has an equivalent length of 3m 10 and a 45 degree angle elbow pipes has an equivalent...

Страница 23: ...ntification section for location Ensure that the gas inlet pressure complies with the following value Standard inlet pressure Natural Gas Propane LP Minimum 7in w c 1 74 kPa 11in w c 2 74 kPa Maximum...

Страница 24: ...xcess air Compare the manifold pressure with the name plate indication Adjust the gas regulator if needed to obtain the right value At high fire you should have a combustion reading of 3 5 O2 approx a...

Страница 25: ...st is above 2 3 VDC the safety verification is enabled Step 2 Safety verification S20 S25 The burner air proving switch PAB1 is verified during the two following tests 1 Activation of the air proving...

Страница 26: ...begin Modulating gas valve and the blower follow the request signal value According to the gas valve position the blower modulates following an air gas relation curve pre set into the PLC memory to a...

Страница 27: ...ximately in order to purge the heat exchanger After the post purge delay the sequence returns to the standby step But if an alarm is active a manual reset is required on the HMI touch screen When the...

Страница 28: ...slot Not used 5 LEDs I O states Digital inputs relay outputs and fast output LEDs 6 USB mini B port For terminal connection to a computer for programming need SoMachine program 7 Clip on lock For 35m...

Страница 29: ...ules 16 Protective cover Cover for SD card Run Stop switch and USB mini B programming port 17 Locking hook Hook not included PLC status LEDs description 1 System status LEDs Label Function Color Descr...

Страница 30: ...le TM3 3 Used PLC I Os Input Description I0 Blower Speed RPM I5 Start Stop Burner request by others I6 Burner air proving switch Alarm I7 Flue vent back pressure Alarm I8 Burner On status proof relay...

Страница 31: ...manual DTHR V9 2020 The following diagram describes the structure of different levels in the HMI Display HMI features Home page Run window Level 1 menu Level 3 menu Password protected Level 4 menu Pa...

Страница 32: ...ollowing a linearization curve and the air blower will follow the gas valve feedback position with the correspondent value determined in the fan modulation table 1 Heat Heating demand signal VDC 2 Gas...

Страница 33: ...Graphic Fan modulation curve for each 0 5 V of gas valve position The vertical rectangle shows the position you have selected for modification If the unit is running vertical and horizontal dashed lin...

Страница 34: ...codes The number 1 being the most recent code 1 Code The alarm code number is related to an alarm type first digit and in which steps it s happened second digit See PLC Alarms section for details 2 E...

Страница 35: ...is possible only if the demand contact I5 on the PLC is open not activated At the end of the process a confirmation will be asked see item 4 2 Fan command in 3 rpm Fan rpm feedback during the process...

Страница 36: ...valve modulation signal demand first row and actual position feedback signal second row Expressed in volt V Gas demand can be different to Heat command 3 Air Burner air blower modulation demand first...

Страница 37: ...tive In this example the prepurge step is now at 6 seconds on a 40 seconds timer 1 Actual count Timer count in real time sec 2 Maximum Maximum value of the count In some situation it s a goal or it s...

Страница 38: ...n the flame safeguard Flame safeguard in alarm see next section Fan feedback lost Combustion air fan feedback signal is missing during 40 Burner ignition step 4 41 Flame stabilization step 5 42 Modula...

Страница 39: ...e Trouble code Trouble description alarms Red Lights OPR CTRL Air flow PTFI Flame Alarm 6 Frequency noise O O 7 Pilot flame failure PTFI O 19 Burner flame failure MTFI O O 21 Lockout Interlock open O...

Страница 40: ...temperature maximum temperature safety switch opens at 160 F Verify the temperature sensor position need to read average temperature Verify burner modulation all controls and temperature signal Verify...

Страница 41: ...40 Installation and operation manual DTHR V9 2020 Typical wiring diagram TYPICAL WIRING DIAGRAM...

Страница 42: ...41 Installation and operation manual DTHR V9 2020 TYPICAL WIRING DIAGRAM...

Страница 43: ...tch in OFF position 2 Check fan belts and adjust or replace if necessary 3 Check the condition of filters and replace if necessary 4 Make sure nothing partially or completely obstructs the air inlet a...

Страница 44: ...y Semi Annual Annual Make sure there are no flammable materials near the unit Make sure that the combustion air inlet and flue vent are not blocked or obstructed Verify flame state and combustion Veri...

Страница 45: ...d damages caused by improper matching or applications of the product or the product s components e damages caused by failing to provide routine and proper maintenance or service to the product f expen...

Страница 46: ...ent Top air baffle installed Low limit installed Condensate drain Note ______________________________________________________________________________________________ Start up Flame signal _________ VD...

Страница 47: ..._____________________________________________________________ ___________________________________________________________________________________________________ ______________________________________...

Отзывы: