15 of 53
www.NabcoEntrances.com
GT1175 (H105 Medium) Hurricane Quick Set-Up and Parts Guide
Rev 8-10-16
P/N C-00106
3. Loosen (1) Nut on each Roller by inserting (1) 7/32” Allen wrench into the exposed end of a Roller Axle. Hold the 7/32” Allen
wrench in place to keep the Roller Axle stationary. At the same time, loosen (1) 7/16-20 Whizlock nut with a 15/16” Open
End Wrench.
4. Slightly tilt the Slide door to make it easier for the (6) Carrier Rollers to ‘catch’ onto the track.
5. With Slide door tilted install the Carrier onto the Track.
Figure 24 Install Carrier onto Track
Track
Carrier
Roller
DN 0779
6 .2 Secure Belt Clip to Carrier
1. Go to the Strike Side of Carrier.
2. Line up (2) screw holes located on the Carrier with (2) screw holes located at the bottom of the Belt Clip bracket.
3. Secure the Belt Clip to the Carrier with (2) 1/4-20 x 3/4 inch Tri-Lobe Head screws provided by NABCO.
Figure 25 Secure Belt Clip to Carrier
1/4-20 x 3/4”
Hex Head Screw
Belt Clip
DN 0884
Carrier
Strike S le
6 .3 Install the Bottom Guide Assembly
(Fixed Sidelite)
FOR FULL OPEN UNITS SKIP TO
SUBSECTION 6.4
1. Go to Bottom Rail of Fixed Sidelite. Locate the Double Roller Assembly previously installed. The Bracket will be sticking out
from underneath.
Figure 26 Install Sliding door to Double Roller Assembly
Double Roller Assembly
DN 1018
Slide Door
Fixed Sidelite
#10-32 x .50
Phillips Head Screw